United States › Grid › Interconnection queues › Minnesota
OTHER · MISOReplace 350 MW of ALTW.FPL_DAEC Unit with Solar; Duane Arnold
Replace 350 MW of ALTW.FPL_DAEC Unit with Solar; Duane Arnold is a 350 MW other request withdrawn in the MISO interconnection queue, in Otter Tail County, Minnesota, connecting to Alliant Energy West.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2021 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- R1006
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- Alliant Energy West
- Connection point (POI)
- Hoot Lake 115KV
- Location
- Otter Tail County, Minnesota
- Technology
- Solar: 350 MW · Other
- Total requested
- 350 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 15 February 2021
- Proposed online date
- July 2023
Location
Marker shows the centre of Otter Tail County; the queue data does not give exact sites.
Other requests in Otter Tail County
- Solar project J4091, Otter Tail CountySolar · 295 MW · in study
- Onshore wind project J4129, Otter Tail CountyOnshore wind · 200 MW · in study
- Solar + storage project J3742, Otter Tail CountySolar + storage · 160 MW · in study
- Hoot Lake Battery Energy Storage SystemBattery storage · 90.7 MW · in study
- Replace Hoot Lake units 2 and 3 (144.8 MW) with Seventeen (17) Sungrow 3 MW solar inverters and PV panels at 49.9 MW; Hoot Lake 2 & 3Other · 49.9 MW · in study
- Onshore wind project G619, Otter Tail CountyOnshore wind · 50.0 MW · built
- Other project G146, Otter Tail CountyOther · 4.0 MW · built
- Solar project GEN-2024-269, Otter Tail CountySolar · 315 MW · withdrawn
- Onshore wind project G721, Otter Tail CountyOnshore wind · 160 MW · withdrawn
- Battery storage project J3778, Otter Tail CountyBattery storage · 100 MW · withdrawn
- Onshore wind project G843, Otter Tail CountyOnshore wind · 100 MW · withdrawn
- Onshore wind project J193, Otter Tail CountyOnshore wind · 50.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem