United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in CAISO (California) — page 36
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Seaport Storage Battery storage |
41.8 MW | Withdrawn / abandoned |
| Berrydale Storage Battery storage |
41.8 MW | Withdrawn / abandoned |
| Joaquin Solar Solar |
41.1 MW | Withdrawn / abandoned |
| Township Power Bank Expansion II Battery storage |
41.0 MW | Withdrawn / abandoned |
| Serenity Solar Solar |
41.0 MW | Withdrawn / abandoned |
| Holly Solar |
40.8 MW | Withdrawn / abandoned |
| Warriors Solar Solar |
40.7 MW | Withdrawn / abandoned |
| Kuiper Energy Storage Battery storage |
40.5 MW | Withdrawn / abandoned |
| Cal Sun Solar + storage |
40.5 MW | Withdrawn / abandoned |
| Cal Sun Solar Solar + storage |
40.5 MW | Withdrawn / abandoned |
| Scenic Energy Storage Battery storage |
40.4 MW | Withdrawn / abandoned |
| Starburst Storage Battery storage |
40.4 MW | Withdrawn / abandoned |
| Mariposa Energy BESS Gas |
40.3 MW | Withdrawn / abandoned |
| Quail Creek Solar 1 Solar |
40.0 MW | Withdrawn / abandoned |
| Little Rock Solar I Solar |
40.0 MW | Withdrawn / abandoned |
| PV-7 Solar |
40.0 MW | Withdrawn / abandoned |
| Holocrystalline Energy Center Battery storage |
40.0 MW | Withdrawn / abandoned |
| Ivanpah Segs 3 - Expansion Solar |
40.0 MW | Withdrawn / abandoned |
| BCS Energy Storage Solar + storage |
40.0 MW | Withdrawn / abandoned |
| Oceanside Energy Storage Battery storage |
40.0 MW | Withdrawn / abandoned |
| Redman Solar I Solar |
40.0 MW | Withdrawn / abandoned |
| Central Coast Onshore wind |
40.0 MW | Withdrawn / abandoned |
| Mendocino Waveconnect Project Hydro |
40.0 MW | Withdrawn / abandoned |
| Almond Grove Solar Project Solar |
40.0 MW | Withdrawn / abandoned |
| Shingle Springs Grid Stabilization Project Battery storage |
40.0 MW | Withdrawn / abandoned |
| Carlsbad Advanced Energy Storage Center Battery storage |
40.0 MW | Withdrawn / abandoned |
| Dunn Siding Solar I Solar |
40.0 MW | Withdrawn / abandoned |
| Lake Alpaugh Battery Storage 2 Battery storage |
40.0 MW | Withdrawn / abandoned |
| Humboldt Waveconnect Project Hydro |
40.0 MW | Withdrawn / abandoned |
| Inyokern Solar I Solar |
40.0 MW | Withdrawn / abandoned |
| SPS As 40MW PV Generation Facility Solar |
40.0 MW | Withdrawn / abandoned |
| PV-5 Solar |
40.0 MW | Withdrawn / abandoned |
| PV-8 Solar |
40.0 MW | Withdrawn / abandoned |
| Borrego Springs Solar South Solar |
40.0 MW | Withdrawn / abandoned |
| Del Sur Solar Solar |
38.0 MW | Withdrawn / abandoned |
| Dixie-Comstock Geothermal Project Geothermal |
38.0 MW | Withdrawn / abandoned |
| Edwards Creek Geothermal Project Geothermal |
38.0 MW | Withdrawn / abandoned |
| Tungsten Mountain Geothermal Project Geothermal |
38.0 MW | Withdrawn / abandoned |
| Jawbone Wind Energy Project Onshore wind |
37.4 MW | Withdrawn / abandoned |
| Murphy 1 Solar |
37.0 MW | Withdrawn / abandoned |
| Pala Canyon Renewable (Fka Pala Fallbrook Energy Center) Solar + storage |
37.0 MW | Withdrawn / abandoned |
| Nightshade Gas |
36.4 MW | Withdrawn / abandoned |
| San Diego Wind #2 - Phase I Onshore wind |
36.0 MW | Withdrawn / abandoned |
| Spi Quincy Other |
35.3 MW | Withdrawn / abandoned |
| Oak Creek Solar I Solar |
35.3 MW | Withdrawn / abandoned |
| WGP Geysers Geothermal |
35.0 MW | Withdrawn / abandoned |
| Otay Mesa Energy Center Agp Gas |
35.0 MW | Withdrawn / abandoned |
| Caithness Ridgetop Wind Repower Onshore wind |
34.0 MW | Withdrawn / abandoned |
| Caithness 251 Wind Repower Onshore wind |
33.1 MW | Withdrawn / abandoned |
| Big Rock Suntower Generating Station Solar |
33.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)