Withdrawn queue requests in CAISO (California) — page 36

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2,186619.9 GW
Active in queue188.6 GW429 requests
Agreement signed96.2 GW235 requests
Withdrawn2,186619.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2,186 requests · page 36 of 44
ProjectCapacityStatusLocationRegionQueuedOnline
Seaport Storage
Battery storage
41.8 MWWithdrawn / abandoned Alameda, CACAISO Apr 2018target 2022
Berrydale Storage
Battery storage
41.8 MWWithdrawn / abandoned Alameda, CACAISO Apr 2018target 2022
Joaquin Solar
Solar
41.1 MWWithdrawn / abandoned Stanislaus, CACAISO May 2016target 2020
Township Power Bank Expansion II
Battery storage
41.0 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Serenity Solar
Solar
41.0 MWWithdrawn / abandoned Fresno, CACAISO May 2016target 2020
Holly
Solar
40.8 MWWithdrawn / abandoned Kings, CACAISO Apr 2018target 2021
Warriors Solar
Solar
40.7 MWWithdrawn / abandoned Fresno, CACAISO May 2017target 2021
Kuiper Energy Storage
Battery storage
40.5 MWWithdrawn / abandoned Sonoma, CACAISO Apr 2019target 2021
Cal Sun
Solar + storage
40.5 MWWithdrawn / abandoned Alameda, CACAISO May 2016target 2019
Cal Sun Solar
Solar + storage
40.5 MWWithdrawn / abandoned Alameda, CACAISO May 2017target 2019
Scenic Energy Storage
Battery storage
40.4 MWWithdrawn / abandoned Lake, CACAISO Apr 2021target 2025
Starburst Storage
Battery storage
40.4 MWWithdrawn / abandoned San Mateo, CACAISO Apr 2021target 2025
Mariposa Energy BESS
Gas
40.3 MWWithdrawn / abandoned Contra Costa, CACAISO Apr 2020target 2027
Quail Creek Solar 1
Solar
40.0 MWWithdrawn / abandoned Fresno, CACAISO Apr 2015target 2018
Little Rock Solar I
Solar
40.0 MWWithdrawn / abandoned Kern, CACAISO Jun 2008target 2010
PV-7
Solar
40.0 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2008target 2011
Holocrystalline Energy Center
Battery storage
40.0 MWWithdrawn / abandoned San Mateo, CACAISO Apr 2018target 2021
Ivanpah Segs 3 - Expansion
Solar
40.0 MWWithdrawn / abandoned San Bernardino, CACAISO Jul 2009target 2013
BCS Energy Storage
Solar + storage
40.0 MWWithdrawn / abandoned Imperial, CACAISO Apr 2014target 2015
Oceanside Energy Storage
Battery storage
40.0 MWWithdrawn / abandoned San Diego, CACAISO May 2017target 2021
Redman Solar I
Solar
40.0 MWWithdrawn / abandoned Kern, CACAISO Jun 2008target 2010
Central Coast
Onshore wind
40.0 MWWithdrawn / abandoned Santa Barbara, CACAISO Aug 2007target 2011
Mendocino Waveconnect Project
Hydro
40.0 MWWithdrawn / abandoned Mendocino, CACAISO Nov 2007target 2012
Almond Grove Solar Project
Solar
40.0 MWWithdrawn / abandoned Kern, CACAISO May 2016target 2020
Shingle Springs Grid Stabilization Project
Battery storage
40.0 MWWithdrawn / abandoned El Dorado, CACAISO Apr 2014target 2016
Carlsbad Advanced Energy Storage Center
Battery storage
40.0 MWWithdrawn / abandoned San Diego, CACAISO Apr 2015target 2019
Dunn Siding Solar I
Solar
40.0 MWWithdrawn / abandoned San Bernardino, CACAISO Jun 2008target 2010
Lake Alpaugh Battery Storage 2
Battery storage
40.0 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Humboldt Waveconnect Project
Hydro
40.0 MWWithdrawn / abandoned Humboldt, CACAISO Nov 2007target 2012
Inyokern Solar I
Solar
40.0 MWWithdrawn / abandoned Kern, CACAISO Jun 2008target 2010
SPS As 40MW PV Generation Facility
Solar
40.0 MWWithdrawn / abandoned Tulare, CACAISO Apr 2012target 2016
PV-5
Solar
40.0 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2008target 2011
PV-8
Solar
40.0 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2008target 2011
Borrego Springs Solar South
Solar
40.0 MWWithdrawn / abandoned San Diego, CACAISO Feb 2010target 2011
Del Sur Solar
Solar
38.0 MWWithdrawn / abandoned Los Angeles, CACAISO Mar 2011target 2013
Dixie-Comstock Geothermal Project
Geothermal
38.0 MWWithdrawn / abandoned Churchill, NVCAISO Mar 2011target 2014
Edwards Creek Geothermal Project
Geothermal
38.0 MWWithdrawn / abandoned Churchill, NVCAISO Mar 2011target 2014
Tungsten Mountain Geothermal Project
Geothermal
38.0 MWWithdrawn / abandoned Churchill, NVCAISO Mar 2011target 2013
Jawbone Wind Energy Project
Onshore wind
37.4 MWWithdrawn / abandoned Kern, CACAISO May 2017target 2021
Murphy 1
Solar
37.0 MWWithdrawn / abandoned Riverside, CACAISO Mar 2011target 2015
Pala Canyon Renewable (Fka Pala Fallbrook Energy Center)
Solar + storage
37.0 MWWithdrawn / abandoned San Diego, CACAISO Apr 2015target 2017
Nightshade
Gas
36.4 MWWithdrawn / abandoned Contra Costa, CACAISO Apr 2021target 2027
San Diego Wind #2 - Phase I
Onshore wind
36.0 MWWithdrawn / abandoned San Diego, CACAISO Feb 2004target 2008
Spi Quincy
Other
35.3 MWWithdrawn / abandoned Plumas, CACAISO May 2016target 2017
Oak Creek Solar I
Solar
35.3 MWWithdrawn / abandoned Kern, CACAISO Mar 2011target 2013
WGP Geysers
Geothermal
35.0 MWWithdrawn / abandoned Sonoma, CACAISO Feb 2015target 2018
Otay Mesa Energy Center Agp
Gas
35.0 MWWithdrawn / abandoned San Diego, CACAISO Apr 2014target 2016
Caithness Ridgetop Wind Repower
Onshore wind
34.0 MWWithdrawn / abandoned Kern, CACAISO Jan 2006target 2015
Caithness 251 Wind Repower
Onshore wind
33.1 MWWithdrawn / abandoned Kern, CACAISO Jan 2006target 2015
Big Rock Suntower Generating Station
Solar
33.0 MWWithdrawn / abandoned Los Angeles, CACAISO Jan 2008target 2009
Page 36 of 44

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)