United States β€Ί Grid β€Ί Interconnection queues β€Ί California

SOLAR Β· CAISO

Murphy 1

Murphy 1 is a 37.0 MW solar request withdrawn in the CAISO interconnection queue, in Riverside County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2011 (completed)
  2. Withdrawn / abandonedApr 2012 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
854
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Blythe Substation 161kV bus
Location
Riverside County, California
Technology
Solar: 37.0 MW
Total requested
37.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
31 March 2011
Proposed online date
January 2015
Withdrawn
April 2012

Location

Marker shows the centre of Riverside County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Riverside County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem