ONSHORE WIND · CAISO

Caithness Ridgetop Wind Repower

Caithness Ridgetop Wind Repower is a 34.0 MW onshore wind request withdrawn in the CAISO interconnection queue, in Kern County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2006 (completed)
  2. Withdrawn / abandonedDec 2012 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
86B
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Canwind Substation 66kV
Location
Kern County, California
Technology
Wind: 34.0 MW
Total requested
34.0 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
20 January 2006
Proposed online date
January 2015
Withdrawn
December 2012

Location

Marker shows the centre of Kern County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Kern County