United States › Grid › Interconnection queues › California

GAS · CAISO

Mariposa Energy BESS

Mariposa Energy BESS is a 40.3 MW gas request withdrawn in the CAISO interconnection queue, in Contra Costa County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedJul 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1693
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Mariposa Energy Center 230kV
Location
Contra Costa County, California
Technology
Gas: 14.1 MW · Battery: 26.2 MW
Total requested
40.3 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2020
Proposed online date
March 2027
Withdrawn
July 2020

Location

Marker shows the centre of Contra Costa County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Contra Costa County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem