United States β€Ί Grid β€Ί Interconnection queues β€Ί California

SOLAR Β· CAISO

Holly

Holly is a 40.8 MW solar request withdrawn in the CAISO interconnection queue, in Kings County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2018 (completed)
  2. Withdrawn / abandonedMar 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1497
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Corcoran-Guernsey 70kV line
Location
Kings County, California
Technology
Solar: 40.8 MW
Total requested
40.8 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
16 April 2018
Proposed online date
November 2021
Withdrawn
March 2019

Location

Marker shows the centre of Kings County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Kings County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem