🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Withdrawn queue requests in CAISO (California) — page 34

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2,186619.9 GW
Active in queue188.6 GW429 requests
Agreement signed96.2 GW235 requests
Withdrawn2,186619.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2,186 requests · page 34 of 44
ProjectCapacityStatusLocationRegionQueuedOnline
Glossy Garlic Solar
Solar + storage
51.0 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Patina
Battery storage
51.0 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Storm
Solar
50.8 MWWithdrawn / abandoned Kern, CACAISO Apr 2019target 2021
Bodie Energy Storage
Battery storage
50.7 MWWithdrawn / abandoned Sutter, CACAISO Apr 2018target 2021
Kingston Energy Storage
Battery storage
50.7 MWWithdrawn / abandoned Madera, CACAISO Apr 2018target 2021
Apple Hill Energy Storage
Battery storage
50.5 MWWithdrawn / abandoned El Dorado, CACAISO May 2016target 2018
Hobbs Energy Storage
Battery storage
50.5 MWWithdrawn / abandoned Madera, CACAISO May 2016target 2018
Avocado Falls
Battery storage
50.3 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
PV-9
Solar
50.0 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2008target 2011
GWF Tracy Solar
Solar
50.0 MWWithdrawn / abandoned San Joaquin, CACAISO Mar 2011target 2014
Binkley Power Project
Geothermal
50.0 MWWithdrawn / abandoned Lake, CACAISO May 2008target 2012
Sunshine Three Expansion
Solar
50.0 MWWithdrawn / abandoned Kern, CACAISO Feb 2010target 2013
Gale Solar 1
Solar
50.0 MWWithdrawn / abandoned Fresno, CACAISO Apr 2015target 2018
SGS Fremont
Battery storage
50.0 MWWithdrawn / abandoned Alameda, CACAISO Apr 2014target 2019
Argonaut Wind Project
Onshore wind
50.0 MWWithdrawn / abandoned San Bernardino, CACAISO Jan 2003target 2010
SKY Valley Wind
Onshore wind
50.0 MWWithdrawn / abandoned Solano, CACAISO Apr 2014target 2017
Vernal 2
Solar
50.0 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Roadrunner
Solar
50.0 MWWithdrawn / abandoned Nye, NVCAISO Apr 2014target 2019
Lerdo Solar
Solar
50.0 MWWithdrawn / abandoned Kern, CACAISO Apr 2013target 2015
Painted Hills III
Onshore wind
50.0 MWWithdrawn / abandoned Riverside, CACAISO Jun 2007target 2009
Cuyama Solar I
Solar
50.0 MWWithdrawn / abandoned Santa Barbara, CACAISO May 2008target 2009
Stockton Repowering Project
Gas
50.0 MWWithdrawn / abandoned San Joaquin, CACAISO Apr 2007target 2009
Caballo Loco
Solar
50.0 MWWithdrawn / abandoned Nye, NVCAISO Apr 2014target 2019
Westlands Artichoke
Solar
50.0 MWWithdrawn / abandoned Kings, CACAISO Apr 2015target 2021
Oveja Solar Farm
Solar
50.0 MWWithdrawn / abandoned Merced, CACAISO Apr 2015target 2020
Sonoran
Solar
50.0 MWWithdrawn / abandoned Riverside, CACAISO May 2007target 2021
Firebaugh Panoche BESS (Fka Panoche Energy Reliability Center)
Battery storage
50.0 MWWithdrawn / abandoned Fresno, CACAISO Apr 2015target 2018
Indigo Winds
Onshore wind
50.0 MWWithdrawn / abandoned San Bernardino, CACAISO Jul 2006target 2008
Ordway Energy Storage (Fka Oceanside BESS)
Battery storage
50.0 MWWithdrawn / abandoned San Diego, CACAISO Apr 2015target 2019
Chaparrel Storage
Battery storage
50.0 MWWithdrawn / abandoned San Diego, CACAISO Apr 2019target 2023
Bear River Ridge Wind Farm
Onshore wind
50.0 MWWithdrawn / abandoned Humboldt, CACAISO May 2007target 2013
Rose Meadow Wind Bank
Battery storage
50.0 MWWithdrawn / abandoned Kern, CACAISO Apr 2014target 2022
Honeybee Solar
Solar
50.0 MWWithdrawn / abandoned Fresno, CACAISO May 2016target 2020
White Rock Solar Farm
Solar
50.0 MWWithdrawn / abandoned Merced, CACAISO Apr 2015target 2020
Rosamond Solar I
Solar
50.0 MWWithdrawn / abandoned Riverside, CACAISO Jun 2008target 2010
Semitropic Solar
Solar
50.0 MWWithdrawn / abandoned Kern, CACAISO Mar 2011target 2014
Cameron Solar I
Solar
50.0 MWWithdrawn / abandoned San Diego, CACAISO Jun 2008target 2009
Sangen
Gas
50.0 MWWithdrawn / abandoned San Francisco, CACAISO Apr 2008target 2011
SGS Livermore (Fka SGS South San Francisco)
Battery storage
50.0 MWWithdrawn / abandoned San Mateo, CACAISO Apr 2014target 2019
Backus Solar Energy
Solar
50.0 MWWithdrawn / abandoned Kern, CACAISO Apr 2012target 2018
Hay Ranch Solar Energy Park
Solar
50.0 MWWithdrawn / abandoned Inyo, CACAISO Jul 2010target 2014
New Geysers
Geothermal
50.0 MWWithdrawn / abandoned Sonoma, CACAISO Mar 2007target 2011
Tunitas
Battery storage
50.0 MWWithdrawn / abandoned San Joaquin, CACAISO Apr 2018target 2020
Golden Hills 1 Wind
Onshore wind
50.0 MWWithdrawn / abandoned Alameda, CACAISO Mar 2011target 2013
D Train
Gas
49.9 MWWithdrawn / abandoned Los Angeles, CACAISO May 2008target 2010
El Cajon Energy Center 2
Gas
49.9 MWWithdrawn / abandoned San Diego, CACAISO Apr 2013target 2015
Cal-Zepp 1
Gas
49.9 MWWithdrawn / abandoned Kern, CACAISO May 2008target 2011
Wellhead Power Pala
Gas
49.9 MWWithdrawn / abandoned San Diego, CACAISO Feb 2007target 2011
Wellhead Power Firebaugh
Gas
49.9 MWWithdrawn / abandoned Fresno, CACAISO Oct 2004target 2006
WP Vande
Gas
49.9 MWWithdrawn / abandoned San Diego, CACAISO Apr 2013target 2016
Page 34 of 44

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)