United States › Grid › Interconnection queues › California

SOLAR · CAISO

Hay Ranch Solar Energy Park

Hay Ranch Solar Energy Park is a 50.0 MW solar request withdrawn in the CAISO interconnection queue, in Inyo County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2010 (completed)
  2. Withdrawn / abandonedJun 2011 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
643AG
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Control-Inyokern 115 kV
Location
Inyo County, California
Technology
Solar: 50.0 MW
Total requested
50.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
31 July 2010
Proposed online date
January 2014
Withdrawn
June 2011

Location

Marker shows the centre of Inyo County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Inyo County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem