SOLAR Β· CAISO

Rosamond Solar I

Rosamond Solar I is a 50.0 MW solar request withdrawn in the CAISO interconnection queue, in Riverside County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2008 (completed)
  2. Withdrawn / abandonedAug 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
458
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Antelope Cal Cement 60kV line
Location
Riverside County, California
Technology
Solar: 50.0 MW
Total requested
50.0 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
2 June 2008
Proposed online date
June 2010
Withdrawn
August 2008

Location

Marker shows the centre of Riverside County; the queue data does not give exact sites.