| Project | Capacity | Status |
|---|---|---|
| Kennedy Storage Solar + storage · Kennedy Bypass Solar LLC |
25.3 MW | In study |
| Burro Loco Energy Storage Battery storage · VESI |
25.1 MW | In study |
| Fluorite Solar Solar |
25.0 MW | Paused / redesign |
| Knickerbocker Storage Other · Knickerbocker Solar LLC |
25.0 MW | Paused / redesign |
| CPS Energy AvR1CT2 Rotor Replacement Gas · CPS Energy |
23.2 MW | In study |
| Brazos Wind Repower Onshore wind · BRAZOS WIND VENTURES, LLC |
22.4 MW | In study |
| Brandon Gas |
21.0 MW | Paused / redesign |
| Sparkl BESS Battery storage |
20.0 MW | Paused / redesign |
| Basalt Solar Solar |
20.0 MW | Paused / redesign |
| Shannon Wind Repower Onshore wind · Shannon Wind, LLC |
18.5 MW | In study |
| Buzzi Maryneal Wind Project Onshore wind · Buzzi Unicem USA |
18.0 MW | In study |
| Midlothian 4 repower Gas · MIDLOTHIAN ENERGY, LLC |
18.0 MW | In study |
| Midlothian Unit 2 repower Gas · MIDLOTHIAN ENERGY, LLC |
18.0 MW | In study |
| Hays Energy Unit 2 Repower Gas · HAYS ENERGY, LLC |
18.0 MW | In study |
| Hays Energy Unit 3 Repower Gas · HAYS ENERGY, LLC |
18.0 MW | In study |
| Midlothian Unit 3 repower Gas · MIDLOTHIAN ENERGY, LLC |
18.0 MW | In study |
| Clutch City Storage I SLF Battery storage |
16.6 MW | Paused / redesign |
| Texas Gulf Sulphur Repower Gas |
16.1 MW | Paused / redesign |
| Stephens Ranch Wind Repower Onshore wind · Stephens Ranch Wind Energy, LLC |
12.4 MW | In study |
| Clutch City Storage II SLF Battery storage |
11.3 MW | Paused / redesign |
| CPS AvR CT1 Rotor Replacement Gas · CPS Energy |
11.3 MW | In study |
| Panther Creek 1 Repower Onshore wind · Panther Creek Wind Farm I&II, LLC |
11.0 MW | In study |
| Mirage Gas |
11.0 MW | Paused / redesign |
| Wildhorse POD Solar Solar · Highpeak Solar, LLC |
10.0 MW | Paused / redesign |
| Harris Spencer BESS Other · Harris Spencer BESS, LLC |
10.0 MW | Paused / redesign |
| Pleasanton BESS Other |
10.0 MW | Paused / redesign |
| Juno Solar 3 Solar · SE JUNO LLC |
10.0 MW | Paused / redesign |
| Blue Summit repower Onshore wind |
9.9 MW | Paused / redesign |
| Panther Creek 2 Repower Onshore wind · Panther Creek Wind Farm I&II, LLC |
8.0 MW | In study |
| Roadrunner Crossing Wind (Uprate) Wind + storage · Roadrunner Wind, LLC |
3.3 MW | In study |
| Ashra Storage SLF Solar + storage · Ashra Solar, LLC |
1.6 MW | In study |
| Kickstart Energy Storage IV Battery storage · Kickstart Infrastructure LLC |
1.4 MW | In study |
| Kickstart Energy Storage III Battery storage · Kickstart Infrastructure LLC |
1.4 MW | In study |
| Kickstart Energy Storage I Battery storage · Kickstart Infrastructure LLC |
1.4 MW | In study |
| Kickstart Energy Storage II Battery storage · Kickstart Infrastructure LLC |
1.4 MW | In study |
| Giga Austin Solar Solar · GIGA TEXAS ENERGY LLC |
-53.3 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)1,398 · 327.9 GW
- SPP (Southwest Power Pool)61 · 16.6 GW
- MISO (Midcontinent)22 · 6,012 MW
- West (non-ISO utilities)5 · 997 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)