United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in ERCOT (Texas) — page 3
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Dovetail Storage Solar + storage · Hecate Energy Dovetail Storage LLC |
509 MW | In study |
| Crescent C BESS Battery storage · OCI La Salle ESS LLC |
508 MW | In study |
| Outpost Storage Solar + storage · Hecate Energy Outpost Storage LLC |
508 MW | In study |
| Tres Rios Ranch Solar Solar + storage · LectricWind LLC |
508 MW | In study |
| Bayside BESS Battery storage |
508 MW | Paused / redesign |
| Tumbleweed Storage Solar + storage · Hecate Energy Tumbleweed Storage LLC |
507 MW | In study |
| Point Mountain Storage Battery storage |
507 MW | Paused / redesign |
| Fort Worth Power Core Bastrop Gas Plant Gas · Fort Worth Power Core LLC |
506 MW | In study |
| Tabor Solar Solar · Quanah Solar LLC |
506 MW | In study |
| Big Field Solar Solar · Big Field Solar Energy LLC |
506 MW | In study |
| Harley Hand Solar Solar + storage · HECTATE ENERGY HARLEY HAND SOLAR LLC |
506 MW | In study |
| Oriole Solar Solar + storage · Rolling Plains Solar |
504 MW | In study |
| Frye Storage Solar + storage · Hecate Energy Frye Storage LLC |
504 MW | In study |
| Zeus Armstrong Solar Solar + storage · Armstrong Solar, LLC |
504 MW | In study |
| Hiru Storage Solar + storage · Hecate Energy Hazel LLC |
504 MW | In study |
| Zeus Scurry Solar Solar + storage · Scurry Solar, LLC |
504 MW | In study |
| Harley Hand Storage Solar + storage · Hecate Energy Harley Hand Solar LLC |
503 MW | In study |
| Cielo Vista Solar Solar + storage · Cielo Vista Solar, LLC |
503 MW | In study |
| Gypsum Plains Solar Solar + storage · Gypsum Plains Solar, LLC |
503 MW | In study |
| Pinnington Storage Solar + storage · Hecate Energy Longhorn Storage LLC |
503 MW | In study |
| Muy Grande Solar Solar · ACE DevCo NC, LLC |
503 MW | In study |
| Dog Star Solar II Solar · Dog Star Solar LLC |
503 MW | In study |
| Dog Star Solar I Solar · Dog Star Solar LLC |
503 MW | In study |
| River Boat Solar Solar + storage · Champion Creek Solar, LLC |
502 MW | In study |
| Commodus Solar Solar · IP Blackwell, LLC |
502 MW | In study |
| Cavell Solar Solar · IP Cavell, LLC |
502 MW | In study |
| Commodus 2 Solar Solar · IP Blackwell II, LLC |
502 MW | In study |
| Freedom Falcon BESS Battery storage · Falcon BESS, LLC |
502 MW | In study |
| Titus Sienta Solar Solar · Sol Sienta Solar, LLC |
502 MW | In study |
| Orbit Energy Storage Battery storage · GCI Orbit Energy Storage, LLC |
502 MW | In study |
| Millsing BESS Battery storage · Millsing BESS |
502 MW | In study |
| MRR Solar Solar · BOULEVARD ASSOCIATES, LLC |
500 MW | In study |
| Elk Ridge Solar Solar · Boulevard Associates, LLC |
500 MW | In study |
| Draco Solar Solar · Draco Solar LLC |
500 MW | In study |
| Aquila Solar Solar · Ben Milam Solar 5 |
500 MW | In study |
| Betel Storage I Battery storage · BETEL STORAGE I |
500 MW | In study |
| Betel Storage II Battery storage · BETEL STORAGE II |
500 MW | In study |
| Black Mountain Somervell Gas Combined Gas · Fort Worth Power Core LLC |
495 MW | In study |
| Siete Wind Onshore wind · Siete Wind, LLC |
493 MW | In study |
| Halyard Wharton Gas · Halyard Energy |
484 MW | Paused / redesign |
| North Royal Thermal (TEF- Due Diligence) Gas · Invenergy Energy Transition Development LLC |
479 MW | In study |
| Mirando Valley Wind Onshore wind · ACE DevCo NC LLC |
479 MW | In study |
| Alkali Creek Wind Onshore wind · Alkali Creek Wind, LLC |
474 MW | In study |
| Serenity Wind Onshore wind · Serenity Wind, LLC |
473 MW | In study |
| Gregory Power Development SLF Gas · Gregory Power Partners LLC |
470 MW | In study |
| Hollow Branch Creek Storage Solar + storage · Hollow Branch Creek Solar LLC |
460 MW | In study |
| Salt-Lick Solar Solar + storage · Salt-Lick Solar, LLC |
453 MW | In study |
| TRIFECTA Gas Gas · NET Power |
453 MW | In study |
| Cedar Draw Solar Solar + storage · Cedar Draw Solar LLC |
451 MW | In study |
| Calpine Guadalupe Peakers Gas · Guadalupe Peaking Energy Center, LLC |
450 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,496 · 455.6 GW
- ERCOT (Texas)1,408 · 328.0 GW
- MISO (Midcontinent)1,337 · 302.2 GW
- Southeast (non-ISO utilities)815 · 118.5 GW
- SPP (Southwest Power Pool)480 · 114.8 GW
- PJM (Mid-Atlantic, Midwest)905 · 105.4 GW
- CAISO (California)194 · 92.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)27 · 6,015 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)