United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in the USA (2025 requests) — page 26
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project 25-IC-1366, Dale County Solar |
110 MW | In study |
| Solar project J4048, Oceana County Solar |
110 MW | In study |
| Solar project J4130, Pepin County Solar |
110 MW | In study |
| Benton Solar II Solar · Xcel Energy |
106 MW | In study |
| Rain Lily Storage 1 Solar + storage · Rain Lily Storage One, LLC |
106 MW | In study |
| Solar project J3081, Hot Spring County Solar |
105 MW | In study |
| Bonham Storage SLF Solar + storage · J&J Solar Ranch LLC |
105 MW | In study |
| Yellow Leaf Solar Solar + storage · Lightsource Renewable Energy Development LLC |
105 MW | In study |
| Power Lane II Gas Gas · GEUS |
104 MW | In study |
| Battery storage project E0004, Saginaw County Battery storage · Hackett Energy Storage LLC |
104 MW | In study |
| Gas project ERAS-2025-001, Lancaster County Gas |
104 MW | In study |
| Rockpile Storage Battery storage · Rockpile Storage, LLC |
104 MW | In study |
| Yellow Leaf BESS Solar + storage · Lightsource Renewable Energy Development LLC |
104 MW | In study |
| Three Ranches BESS Solar + storage · Three Ranches Energy LLC |
103 MW | In study |
| Rio Vista Storage Solar + storage · Rio Vista Storage, LLC |
103 MW | In study |
| Wisdom BESS SLF Solar + storage · Wisdom Green Energy LLC |
103 MW | In study |
| Prairie Horizon Energy Storage 4 Battery storage · Tempus Power management LLC |
102 MW | In study |
| Blackland Prairie 1 Energy Storage Battery storage · Tempus power management LLC |
102 MW | In study |
| watermelon 6 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| watermelon 2 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Edgewood BESS 2 Battery storage · Tempus Power management LLC |
102 MW | In study |
| Pioneer Path Energy Storage 1 Battery storage · Tempus Power management LLC |
102 MW | In study |
| watermelon 1 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| watermelon 3 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Prairie Horizon Energy Storage 3 Battery storage · Tempus Power management LLC |
102 MW | In study |
| Pioneer Path Energy Storage 2 Battery storage · Tempus Power management LLC |
102 MW | In study |
| Pioneer Path Energy Storage 4 Battery storage · Tempus Power management LLC |
102 MW | In study |
| watermelon 4 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Prairie Horizon Energy Storage 1 Battery storage · Tempus Power management LLC |
102 MW | In study |
| Blackland Prairie 2 Energy Storage Battery storage · Tempus power management LLC |
102 MW | In study |
| watermelon 5 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Pioneer Path Energy Storage 3 Battery storage · Tempus Power management LLC |
102 MW | In study |
| watermelon 8 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Prairie Horizon Energy Storage 2 Battery storage · Tempus Power management LLC |
102 MW | In study |
| watermelon 7 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Blackland Prairie 3 Energy Storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Battery storage project GEN-2025-SR7, Muskogee County Battery storage |
102 MW | In study |
| Crocus Solar Solar + storage · Crocus Solar, LLC |
102 MW | In study |
| Greyhound Solar - Phase F Solar · ROCKHOUND SOLAR 2 LLC DBA GREYHOUND SOLAR |
102 MW | Agreement signed |
| Gas project CS25-05, Kootenai County Gas |
102 MW | In study |
| Gas project CS25-04, Kootenai County Gas |
102 MW | In study |
| Margay Energy Storage Battery storage · PowerPulse LLC |
101 MW | In study |
| Strawberry Dunes Solar SLF Solar + storage · Strawberry Dunes LLC |
101 MW | In study |
| Calf Creek Storage Battery storage · Coyote Ridge Storage, LLC |
101 MW | In study |
| Goat Mountain BESS 2 Wind + storage · Goat Wind LLC |
101 MW | In study |
| Mobee Springs BESS Battery storage · Mobee Springs, LLC |
101 MW | In study |
| Firefly Fields Solar Solar + storage · Firefly Fields Energy Center LLC |
101 MW | In study |
| Diamond Sage BESS 2 Solar + storage · DGC Renewables, LLC |
100 MW | In study |
| Diamond Sage BESS 1 Solar + storage · DGC Renewables, LLC |
100 MW | In study |
| Solar project LGE-CS2025-013, Ballard County Solar |
100 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- MISO (Midcontinent)390 · 120.8 GW
- ERCOT (Texas)361 · 104.0 GW
- West (non-ISO utilities)325 · 84.1 GW
- SPP (Southwest Power Pool)268 · 71.3 GW
- Southeast (non-ISO utilities)264 · 42.0 GW
- PJM (Mid-Atlantic, Midwest)228 · 29.8 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)