United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in CAISO (California) — page 24
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Rocky Hill Solar Solar + storage |
154 MW | Withdrawn / abandoned |
| Alamo Springs Solar 1 Solar + storage |
154 MW | Withdrawn / abandoned |
| Black Hills Playa B Solar Solar + storage |
154 MW | Withdrawn / abandoned |
| Black Hills Playa A Solar Solar + storage |
154 MW | Withdrawn / abandoned |
| Stargaze Solar BESS Solar |
154 MW | Withdrawn / abandoned |
| Quartz 9 Solar |
154 MW | Withdrawn / abandoned |
| Limon Energy Park Solar + storage |
153 MW | Withdrawn / abandoned |
| Arroyo Reyes Solar Solar |
153 MW | Withdrawn / abandoned |
| Alembic Gas |
153 MW | Withdrawn / abandoned |
| East-Bay-Wind Onshore wind |
153 MW | Withdrawn / abandoned |
| Almond Wood Energy Solar |
153 MW | Withdrawn / abandoned |
| Yellow Pine 1 Solar |
153 MW | Withdrawn / abandoned |
| Hammock Storage Battery storage |
153 MW | Withdrawn / abandoned |
| Golden Rectangle Solar + storage |
153 MW | Withdrawn / abandoned |
| Halifax Solar + storage |
153 MW | Withdrawn / abandoned |
| Spartan Energy Storage Battery storage |
152 MW | Withdrawn / abandoned |
| King Flat Wind Farm 1 Onshore wind |
152 MW | Withdrawn / abandoned |
| Emperor Storage Battery storage |
152 MW | Withdrawn / abandoned |
| Ferry Hybrid Solar Solar + storage |
152 MW | Withdrawn / abandoned |
| Mesut Storage Battery storage |
152 MW | Withdrawn / abandoned |
| Jasper Energy Storage Battery storage |
152 MW | Withdrawn / abandoned |
| Hensley Hybrid Solar Solar + storage |
152 MW | Withdrawn / abandoned |
| Rosebowl Battery storage |
152 MW | Withdrawn / abandoned |
| Trivor Energy Storage Battery storage |
151 MW | Withdrawn / abandoned |
| Cazadores Storage Battery storage |
151 MW | Withdrawn / abandoned |
| Avenida Del Sul Solar |
151 MW | Withdrawn / abandoned |
| Ridge Solar Storage Solar |
151 MW | Withdrawn / abandoned |
| Falcon Energy Center Battery storage |
151 MW | Withdrawn / abandoned |
| Stomper Storage Battery storage |
151 MW | Withdrawn / abandoned |
| Ruby Energy Storage Battery storage |
151 MW | Withdrawn / abandoned |
| Quail Lake Storage Battery storage |
151 MW | Withdrawn / abandoned |
| Railyard Energy Storage Battery storage |
151 MW | Withdrawn / abandoned |
| Alta 1 Storage Battery storage |
151 MW | Withdrawn / abandoned |
| Amberjill Energy Solar + storage |
151 MW | Withdrawn / abandoned |
| Pinscher Energy Storage Battery storage |
151 MW | Withdrawn / abandoned |
| Mojave Soleil Solar |
150 MW | Withdrawn / abandoned |
| Alta 14 Solar |
150 MW | Withdrawn / abandoned |
| Tulare Solar Solar |
150 MW | Withdrawn / abandoned |
| Candlewood Wind Onshore wind |
150 MW | Withdrawn / abandoned |
| Rancho Wistaria Solar Energy Center Solar |
150 MW | Withdrawn / abandoned |
| Mule Mountain - C5 Solar |
150 MW | Withdrawn / abandoned |
| Antelope Valley Renewable Energy Farm - Solar Solar |
150 MW | Withdrawn / abandoned |
| Firehawk Solar 1 Solar + storage |
150 MW | Withdrawn / abandoned |
| Acorn Greenworks Solar |
150 MW | Withdrawn / abandoned |
| Silver State South 3 Solar Solar |
150 MW | Withdrawn / abandoned |
| Upc Grand View Winds Onshore wind |
150 MW | Withdrawn / abandoned |
| Troy Lake Wind Onshore wind |
150 MW | Withdrawn / abandoned |
| Maricopa California Solar Farms II Solar |
150 MW | Withdrawn / abandoned |
| Green Borders Geothermal Phase 2 Geothermal |
150 MW | Withdrawn / abandoned |
| Rice Solar Energy Solar |
150 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)