United States › Grid › Interconnection queues › Nevada

SOLAR + STORAGE · CAISO

Black Hills Playa A Solar

Black Hills Playa A Solar is a 154 MW solar + storage request withdrawn in the CAISO interconnection queue, in Clark County, Nevada, connecting to GLW.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedJul 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1651
Grid region
CAISO (California)
Utility / transmission owner
GLW
Connection point (POI)
Sloan Canyon Switching Station 230kV
Location
Clark County, Nevada
Technology
Solar: 102 MW · Battery: 51.2 MW
Total requested
154 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2019
Proposed online date
December 2023
Withdrawn
July 2019

Location

Marker shows the centre of Clark County; the queue data does not give exact sites.

Power plants in Nevada · Transmission lines in Nevada

Other requests in Clark County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem