BATTERY STORAGE · CAISOTrivor Energy Storage
Trivor Energy Storage is a 151 MW battery storage request withdrawn in the CAISO interconnection queue, in Merced County, California, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2021 (completed)
- Withdrawn / abandonedDec 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1948
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- El Nido Substation 115 kV
- Location
- Merced County, California
- Technology
- Battery: 151 MW
- Total requested
- 151 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 15 April 2021
- Proposed online date
- January 2025
- Withdrawn
- December 2022
Location
Marker shows the centre of Merced County; the queue data does not give exact sites.
Power plants in California · Transmission lines in California
Other requests in Merced County
- Wingtip Solar 1Solar + storage · 2,352 MW · agreement signed
- AustralisSolar + storage · 614 MW · agreement signed
- Spikes Peak SolarSolar + storage · 318 MW · agreement signed
- Wright SolarSolar + storage · 280 MW · agreement signed
- Cougar StorageBattery storage · 204 MW · agreement signed
- Las Camas 3Solar + storage · 203 MW · agreement signed
- Las Camas 1Solar + storage · 203 MW · agreement signed
- ZetaSolar + storage · 155 MW · agreement signed
- Gonzaga HybridWind + storage · 115 MW · agreement signed
- Gonzaga Wind FarmOnshore wind · 80.0 MW · agreement signed
- Carissalito CreekSolar + storage · 832 MW · in study
- CantusSolar + storage · 499 MW · in study