United States › Grid › Interconnection queues › California
SOLAR + STORAGE · CAISOFerry Hybrid Solar
Ferry Hybrid Solar is a 152 MW solar + storage request withdrawn in the CAISO interconnection queue, in Madera County, California, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2020 (completed)
- Withdrawn / abandonedJul 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1716
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Dairyland - Mendota 115kV line
- Location
- Madera County, California
- Technology
- Solar: 102 MW · Battery: 50.0 MW
- Total requested
- 152 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 15 April 2020
- Proposed online date
- November 2023
- Withdrawn
- July 2020
Location
Marker shows the centre of Madera County; the queue data does not give exact sites.
Power plants in California · Transmission lines in California
Other requests in Madera County
- Lotus Solar 2Solar + storage · 406 MW · in study
- GaladrielBattery storage · 318 MW · in study
- Puma StorageBattery storage · 204 MW · in study
- Flores StorageBattery storage · 152 MW · in study
- Valetudo Energy StorageBattery storage · 79.6 MW · in study
- Lotus Solar FarmSolar · 50.0 MW · built
- Chowchilla Solar ProjectSolar · 20.0 MW · built
- Chowchilla BiomassOther · 10.5 MW · built
- Spectrum Energy Storage 2Battery storage · 566 MW · withdrawn
- Delilah Energy Storage 2Battery storage · 300 MW · withdrawn
- TrigoSolar + storage · 230 MW · withdrawn
- IrrigosaSolar + storage · 230 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem