🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Queue requests in study in ERCOT (Texas) — page 21

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown1,408328.0 GW
Active in queue447.3 GW1,986 requests
Agreement signed119.3 GW578 requests
Withdrawn1,158262.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

1,408 requests · page 21 of 29
ProjectCapacityStatusLocationRegionQueuedOnline
Marengo BESS
Battery storage · BRP BLUE TOPAZ 8, LLC
121 MWIn study Cameron, TXERCOT May 2023target 2028
Iron Cowboy Solar
Solar + storage · Vaquero II Solar, LLC
121 MWIn study San Patricio, TXERCOT Jun 2025target 2028
Wagyu BESS SLF
Battery storage · Wagyu BESS, LLC
121 MWIn study Brazoria, TXERCOT Jun 2025target 2026
Borden Dino Solar
Solar + storage · Borden Dino Solar, LLC
121 MWIn study Borden, TXERCOT Apr 2025target 2028
Neal Battery
Solar + storage · CH Neal Battery LLC
121 MWIn study Wharton, TXERCOT Oct 2025target 2029
Rolling Plains BESS
Battery storage · Haskell County BESS LLC
120 MWIn study Haskell, TXERCOT Aug 2024target 2028
Rosharon BESS
Battery storage · Rosharon BESS LLC
120 MWIn study Brazoria, TXERCOT Apr 2024target 2028
Riverwalk BESS
Battery storage · RWE Solar Developement, LLC
120 MWIn study Bexar, TXERCOT Jul 2022target 2027
Kalina Solar
Solar · Aurora Solar LLC
120 MWIn study San Patricio, TXERCOT Aug 2020target 2029
Razorbill Storage
Solar + storage · RWE Solar Development, LLC
120 MWIn study Matagorda, TXERCOT Aug 2020target 2027
Solterra_canceled Solar
Solar
120 MWPaused / redesign Hopkins, TXERCOT
Buckaroo BESS
Battery storage · Weatherford BESS LLC
120 MWIn study Parker, TXERCOT May 2024target 2027
Wild Horse Desert Solar
Solar + storage · Wild Horse Desert Solar, LLC
120 MWIn study Dimmit, TXERCOT Dec 2024target 2028
Pradera Solar
Solar + storage · Pradera Solar, LLC
118 MWIn study Webb, TXERCOT Jul 2021target 2027
Roxton Solar
Solar + storage · Roxton Solar, LLC
117 MWIn study Lamar, TXERCOT Nov 2024target 2028
Pioneer Hutt Solar
Solar
116 MWPaused / redesign Midland, TXERCOT Oct 2022
Butcherbird Solar
Solar · Butcherbird Solar, LLC
116 MWIn study Bell, TXERCOT Dec 2023target 2027
Pioneer Hutt Solar (Alternative POI)
Solar · NextEra Energy Interconnection Holdings LLC
116 MWIn study Midland, TXERCOT Jun 2023target 2028
Marcos BESS
Solar + storage · GRS BESS Texas Eight LLC
116 MWIn study Victoria, TXERCOT Feb 2024target 2027
Amphion Solar Phase 3
Solar · Amphion Solar, LLC
115 MWIn study Atascosa, TXERCOT Apr 2025target 2029
Velado Storage SLF
Solar + storage · Velado Solar, LLC
115 MWIn study Dimmit, TXERCOT Nov 2024target 2028
Velado Solar SLF
Solar + storage · Velado Solar, LLC
115 MWIn study Dimmit, TXERCOT Nov 2024target 2028
Hayrick BESS
Battery storage · Gransolar Texas Five LLC
114 MWIn study Coke, TXERCOT Aug 2022target 2028
Neptune Gas Generation Plant
Gas · BPX Production Company
114 MWIn study Reeves, TXERCOT Dec 2024target 2028
Lost Pines Gas Recip Phase 2
Gas · LCRA
113 MWIn study Bastrop, TXERCOT Jul 2025target 2031
Angus Solar
Solar · Angus Solar, LLC
113 MWPaused / redesign Bosque, TXERCOT Nov 2017target 2026
Schneider Gas Rice
Gas · LCRA
113 MWIn study Caldwell, TXERCOT Jul 2025target 2029
Lost Pines Gas Recip
Gas · LCRA
113 MWIn study Bastrop, TXERCOT Jul 2025target 2029
Schneider Gas Rice Phase 2
Gas · LCRA
113 MWIn study Caldwell, TXERCOT Jul 2025target 2031
Alpujarra Solar
Solar · Greening USA Corp.
113 MWIn study Wharton, TXERCOT Sep 2024target 2028
Atria Solar
Solar · Atria Energy Project, LLC
112 MWIn study Chambers, TXERCOT Oct 2020target 2025
Coyote Ridge BESS
Battery storage · Grenergy USA
111 MWIn study Brown, TXERCOT Jan 2025target 2027
Scrap Iron Solar
Solar · Energiekontor US Texas SP 15 LLC
111 MWIn study Grimes, TXERCOT Sep 2024target 2028
Carpet Tech Solar One
Solar · CT Solar One
111 MWIn study Kent, TXERCOT Jul 2025target 2028
Ophelia Solar
Solar · Ophelia Solar
111 MWIn study Ector, TXERCOT Sep 2022target 2028
Megacharge BESS
Battery storage · SMT Harlingen III LLC
110 MWIn study Cameron, TXERCOT Jun 2023target 2027
Trinidad ESS Addition
Battery storage
110 MWPaused / redesign Henderson, TXERCOT Dec 2019target 2026
Solheim Solar
Solar · Solheim Solar, LLC
109 MWIn study Bosque, TXERCOT Aug 2023target 2027
Georgia-Lynn BESS
Battery storage · Georgia Lynn BESS LLC
109 MWIn study Victoria, TXERCOT Jul 2024target 2028
Vault Solar
Solar · PPM THR Solar
109 MWIn study Palo Pinto, TXERCOT Jun 2023target 2026
Inertia BESS 3
Battery storage
108 MWPaused / redesign Jones, TXERCOT Aug 2022
Comanche Creek generating station
Gas · Longfellow Power LLC
107 MWIn study Pecos, TXERCOT Jul 2024target 2027
Wittig Solar
Solar · Greenalia Solar Power Wittig LLC
107 MWIn study Wharton, TXERCOT Feb 2024target 2027
Frio Farm
Solar · PREMIER ENGINEERING USA CORP.
107 MWIn study Frio, TXERCOT Dec 2021target 2026
Fort Duncan BESS
Other · Fort Duncan BESS LLC
106 MWPaused / redesign Maverick, TXERCOT Aug 20212025
Photon Solar 4 SLF
Solar · GulfStar Power, LLC
106 MWIn study Wharton, TXERCOT Sep 2024target 2026
Santa Monica Solar
Solar · Karol Solar IV
106 MWIn study Navarro, TXERCOT Sep 2023target 2028
McClure Solar
Solar · McClure Solar LLC
106 MWIn study Palo Pinto, TXERCOT Jun 2020target 2025
Rain Lily Storage 1
Solar + storage · Rain Lily Storage One, LLC
106 MWIn study Hood, TXERCOT Feb 2025target 2028
Burgos Solar
Solar · Twin Oaks Solar, LLC
106 MWIn study Milam, TXERCOT Oct 2022target 2027
Page 21 of 29

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)