United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in ERCOT (Texas) — page 21
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Marengo BESS Battery storage · BRP BLUE TOPAZ 8, LLC |
121 MW | In study |
| Iron Cowboy Solar Solar + storage · Vaquero II Solar, LLC |
121 MW | In study |
| Wagyu BESS SLF Battery storage · Wagyu BESS, LLC |
121 MW | In study |
| Borden Dino Solar Solar + storage · Borden Dino Solar, LLC |
121 MW | In study |
| Neal Battery Solar + storage · CH Neal Battery LLC |
121 MW | In study |
| Rolling Plains BESS Battery storage · Haskell County BESS LLC |
120 MW | In study |
| Rosharon BESS Battery storage · Rosharon BESS LLC |
120 MW | In study |
| Riverwalk BESS Battery storage · RWE Solar Developement, LLC |
120 MW | In study |
| Kalina Solar Solar · Aurora Solar LLC |
120 MW | In study |
| Razorbill Storage Solar + storage · RWE Solar Development, LLC |
120 MW | In study |
| Solterra_canceled Solar Solar |
120 MW | Paused / redesign |
| Buckaroo BESS Battery storage · Weatherford BESS LLC |
120 MW | In study |
| Wild Horse Desert Solar Solar + storage · Wild Horse Desert Solar, LLC |
120 MW | In study |
| Pradera Solar Solar + storage · Pradera Solar, LLC |
118 MW | In study |
| Roxton Solar Solar + storage · Roxton Solar, LLC |
117 MW | In study |
| Pioneer Hutt Solar Solar |
116 MW | Paused / redesign |
| Butcherbird Solar Solar · Butcherbird Solar, LLC |
116 MW | In study |
| Pioneer Hutt Solar (Alternative POI) Solar · NextEra Energy Interconnection Holdings LLC |
116 MW | In study |
| Marcos BESS Solar + storage · GRS BESS Texas Eight LLC |
116 MW | In study |
| Amphion Solar Phase 3 Solar · Amphion Solar, LLC |
115 MW | In study |
| Velado Storage SLF Solar + storage · Velado Solar, LLC |
115 MW | In study |
| Velado Solar SLF Solar + storage · Velado Solar, LLC |
115 MW | In study |
| Hayrick BESS Battery storage · Gransolar Texas Five LLC |
114 MW | In study |
| Neptune Gas Generation Plant Gas · BPX Production Company |
114 MW | In study |
| Lost Pines Gas Recip Phase 2 Gas · LCRA |
113 MW | In study |
| Angus Solar Solar · Angus Solar, LLC |
113 MW | Paused / redesign |
| Schneider Gas Rice Gas · LCRA |
113 MW | In study |
| Lost Pines Gas Recip Gas · LCRA |
113 MW | In study |
| Schneider Gas Rice Phase 2 Gas · LCRA |
113 MW | In study |
| Alpujarra Solar Solar · Greening USA Corp. |
113 MW | In study |
| Atria Solar Solar · Atria Energy Project, LLC |
112 MW | In study |
| Coyote Ridge BESS Battery storage · Grenergy USA |
111 MW | In study |
| Scrap Iron Solar Solar · Energiekontor US Texas SP 15 LLC |
111 MW | In study |
| Carpet Tech Solar One Solar · CT Solar One |
111 MW | In study |
| Ophelia Solar Solar · Ophelia Solar |
111 MW | In study |
| Megacharge BESS Battery storage · SMT Harlingen III LLC |
110 MW | In study |
| Trinidad ESS Addition Battery storage |
110 MW | Paused / redesign |
| Solheim Solar Solar · Solheim Solar, LLC |
109 MW | In study |
| Georgia-Lynn BESS Battery storage · Georgia Lynn BESS LLC |
109 MW | In study |
| Vault Solar Solar · PPM THR Solar |
109 MW | In study |
| Inertia BESS 3 Battery storage |
108 MW | Paused / redesign |
| Comanche Creek generating station Gas · Longfellow Power LLC |
107 MW | In study |
| Wittig Solar Solar · Greenalia Solar Power Wittig LLC |
107 MW | In study |
| Frio Farm Solar · PREMIER ENGINEERING USA CORP. |
107 MW | In study |
| Fort Duncan BESS Other · Fort Duncan BESS LLC |
106 MW | Paused / redesign |
| Photon Solar 4 SLF Solar · GulfStar Power, LLC |
106 MW | In study |
| Santa Monica Solar Solar · Karol Solar IV |
106 MW | In study |
| McClure Solar Solar · McClure Solar LLC |
106 MW | In study |
| Rain Lily Storage 1 Solar + storage · Rain Lily Storage One, LLC |
106 MW | In study |
| Burgos Solar Solar · Twin Oaks Solar, LLC |
106 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,496 · 455.6 GW
- ERCOT (Texas)1,408 · 328.0 GW
- MISO (Midcontinent)1,337 · 302.2 GW
- Southeast (non-ISO utilities)815 · 118.5 GW
- SPP (Southwest Power Pool)480 · 114.8 GW
- PJM (Mid-Atlantic, Midwest)905 · 105.4 GW
- CAISO (California)194 · 92.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)27 · 6,015 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)