United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Queue requests in study in the USA (2017 requests) β€” page 2

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown7612.3 GW
Active in queue51.0 GW292 requests
Agreement signed32.8 GW182 requests
Withdrawn1,258161.7 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

76 requests Β· page 2 of 2
ProjectCapacityStatusLocationRegionQueuedOnline
Angus Storage
Battery storage
63.0 MWPaused / redesign Bosque, TXERCOT Nov 2017
Columbia County 1
Solar Β· Hecate Energy Columbia County 1, LLC
60.0 MWIn study Columbia, NYNYISO Jul 2017target 2027
Agate Solar
Solar
60.0 MWPaused / redesign Ellis, TXERCOT Aug 2017
Sweetleaf Solar
Solar
60.0 MWPaused / redesign Halifax, NCPJM Aug 2017target 2027
Chestnut Solar
Solar
60.0 MWPaused / redesign Marion, OHPJM Sep 2017target 2026
Solar project JEA-Q005-PV, Duval County
Solar
50.0 MWPaused / redesign Duval, FLSoutheast Dec 2017target 2035
Solar project JEA-Q006-PV, Duval County
Solar
50.0 MWPaused / redesign Duval, FLSoutheast Dec 2017target 2050
Solar + storage project 905, Klamath County
Solar + storage Β· Fresh Air Energy II, LLC
50.0 MWPaused / redesign Klamath, ORWest Jul 2017target 2019
Solar project JEA-Q004-PV, Duval County
Solar
50.0 MWPaused / redesign Duval, FLSoutheast Dec 2017target 2050
Solar project JEA-Q003-PV, Duval County
Solar
50.0 MWPaused / redesign Duval, FLSoutheast Dec 2017target 2050
Watkins Glen Solar
Solar Β· Watkins Glen Solar Energy Center, LLC
50.0 MWIn study Schuyler, NYNYISO Mar 2017target 2028
Steubenville Solar
Solar
49.5 MWPaused / redesign Jefferson, OHPJM Nov 2017target 2027
Solar + storage project 862, Box Elder County
Solar + storage Β· Rocket Solar, LLC
45.0 MWPaused / redesign Box Elder, UTWest Apr 2017target 2019
Lueders Solar
Solar Β· Innovative Solar 75
40.0 MWIn study Haskell, TXERCOT Jul 2017target 2028
Sweetleaf Solar
Solar
33.0 MWPaused / redesign Halifax, NCPJM Aug 2017target 2027
Spinel Solar
Solar
30.0 MWPaused / redesign Medina, TXERCOT Aug 2017
Fluorite Solar
Solar
25.0 MWPaused / redesign Uvalde, TXERCOT Aug 2017
SunEast Skyline Solar LLC
Solar Β· SunEast Skyline Solar LLC
20.0 MWIn study Oneida, NYNYISO Sep 2017target 2028
Cedar Creek Solar
Solar
20.0 MWPaused / redesign Kent, DEPJM Apr 2017target 2027
Cedar Creek Solar
Solar
20.0 MWPaused / redesign Kent, DEPJM Apr 2017target 2027
Blue Creek Wind Farm
Solar
20.0 MWPaused / redesign Van Wert, OHPJM Feb 2017target 2024
Basalt Solar
Solar
20.0 MWPaused / redesign Uvalde, TXERCOT Jul 2017
Solar project G0570, Lake County
Solar
20.0 MWIn study Lake, ORWest Jul 2017target 2019
Solar project G0571, Lake County
Solar
20.0 MWIn study Lake, ORWest Jul 2017target 2019
Solar project G0572, Lake County
Solar
20.0 MWIn study Lake, ORWest Jul 2017target 2019
Battery storage project GEN-2017-117, Canadian County
Battery storage
19.8 MWPaused / redesign Canadian, OKSPP Nov 2017target 2029
Page 2 of 2

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)