United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESQueue requests in study in the USA (2017 requests) β page 2
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Angus Storage Battery storage |
63.0 MW | Paused / redesign |
| Columbia County 1 Solar Β· Hecate Energy Columbia County 1, LLC |
60.0 MW | In study |
| Agate Solar Solar |
60.0 MW | Paused / redesign |
| Sweetleaf Solar Solar |
60.0 MW | Paused / redesign |
| Chestnut Solar Solar |
60.0 MW | Paused / redesign |
| Solar project JEA-Q005-PV, Duval County Solar |
50.0 MW | Paused / redesign |
| Solar project JEA-Q006-PV, Duval County Solar |
50.0 MW | Paused / redesign |
| Solar + storage project 905, Klamath County Solar + storage Β· Fresh Air Energy II, LLC |
50.0 MW | Paused / redesign |
| Solar project JEA-Q004-PV, Duval County Solar |
50.0 MW | Paused / redesign |
| Solar project JEA-Q003-PV, Duval County Solar |
50.0 MW | Paused / redesign |
| Watkins Glen Solar Solar Β· Watkins Glen Solar Energy Center, LLC |
50.0 MW | In study |
| Steubenville Solar Solar |
49.5 MW | Paused / redesign |
| Solar + storage project 862, Box Elder County Solar + storage Β· Rocket Solar, LLC |
45.0 MW | Paused / redesign |
| Lueders Solar Solar Β· Innovative Solar 75 |
40.0 MW | In study |
| Sweetleaf Solar Solar |
33.0 MW | Paused / redesign |
| Spinel Solar Solar |
30.0 MW | Paused / redesign |
| Fluorite Solar Solar |
25.0 MW | Paused / redesign |
| SunEast Skyline Solar LLC Solar Β· SunEast Skyline Solar LLC |
20.0 MW | In study |
| Cedar Creek Solar Solar |
20.0 MW | Paused / redesign |
| Cedar Creek Solar Solar |
20.0 MW | Paused / redesign |
| Blue Creek Wind Farm Solar |
20.0 MW | Paused / redesign |
| Basalt Solar Solar |
20.0 MW | Paused / redesign |
| Solar project G0570, Lake County Solar |
20.0 MW | In study |
| Solar project G0571, Lake County Solar |
20.0 MW | In study |
| Solar project G0572, Lake County Solar |
20.0 MW | In study |
| Battery storage project GEN-2017-117, Canadian County Battery storage |
19.8 MW | Paused / redesign |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)27 Β· 6,633 MW
- ERCOT (Texas)16 Β· 2,714 MW
- PJM (Mid-Atlantic, Midwest)14 Β· 1,032 MW
- Southeast (non-ISO utilities)11 Β· 843 MW
- NYISO (New York)6 Β· 749 MW
- SPP (Southwest Power Pool)2 Β· 330 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)