United States โบ Grid โบ Interconnection queues โบ New York
OCTARY USA ยท INTERCONNECTION QUEUESInterconnection queue in New York (2024 requests) โ page 2
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Coral Energy Storage Battery storage ยท Hanwha Q CELLS USA Corp. |
100 MW | In study |
| Mill Point Solar II Solar + storage ยท ConnectGen Montgomery County LLC |
100 MW | In study |
| South Bronx Energy Storage Battery storage ยท Prologis Energy LLC |
100 MW | In study |
| Marlboro Storage Battery storage ยท Origis Development LLC |
100 MW | In study |
| Eastwater Energy Storage Battery storage ยท GCI Eastwater, LLC |
100 MW | In study |
| Horseblock Energy Storage Battery storage ยท ACE DevCo NC, LLC |
100 MW | In study |
| Zenobe Burns LLC Battery storage ยท Zenobe Americas Inc. |
100 MW | In study |
| Alcazar 1 Battery storage ยท Terra-Gen Development Company, LLC |
100 MW | In study |
| Fort Edward Solar Farm (NY53) Solar ยท Fort Edward Solar LLC |
100 MW | In study |
| Arch 3 Battery storage ยท Terra-Gen Development Company, LLC |
100 MW | In study |
| Kce NY 34 Battery storage ยท KCE NY 34, LLC |
100 MW | In study |
| Jericho Solar Solar ยท Jericho Solar Park LLC |
100 MW | In study |
| Aria Storage 1 Battery storage ยท Terra-Gen Development Company, LLC |
100 MW | In study |
| Hemlock Hollow Wind Onshore wind ยท Liberty Renewables Inc. |
95.0 MW | In study |
| Hell Gate Energy Storage Battery storage ยท the NY Power Authority |
90.0 MW | In study |
| Bassett Energy Storage Battery storage ยท Bassett Energy Storage |
79.9 MW | In study |
| Daphne Energy Storage Battery storage ยท Hanwha Q CELLS USA Corp. |
75.0 MW | In study |
| Leo Energy Storage Battery storage ยท BGTF US Development Holdings LLC |
75.0 MW | In study |
| Dewdrop Wind Onshore wind ยท Dewdrop Wind LLC |
62.0 MW | In study |
| Cayuga Solar Solar ยท Cayuga Lake Solar, LLC |
60.0 MW | In study |
| Kce NY 21 Battery storage ยท KCE NY 21, LLC |
60.0 MW | In study |
| Town Line Solar Phase II Solar + storage ยท RWE Solar Development, LLC |
60.0 MW | In study |
| Sandlot IFB Battery storage ยท Sandlot Energy LLC |
50.0 MW | In study |
| Azalea Wind 1 Onshore wind ยท Azalea Wind LLC |
50.0 MW | In study |
| Azalea Wind 2 Onshore wind ยท Azalea Wind LLC |
50.0 MW | In study |
| Kce NY 31 Battery storage ยท KCE NY 31, LLC |
50.0 MW | In study |
| Porter Energy Storage Battery storage ยท BGTF US Development Holdings LLC |
50.0 MW | In study |
| Kce NY 30 Battery storage ยท KCE NY 30, LLC |
50.0 MW | In study |
| Buttercup Wind Onshore wind ยท Buttercup Wind LLC |
49.9 MW | In study |
| Brentwood Energy Storage Battery storage ยท the NY Power Authority |
49.1 MW | In study |
| Pouch Energy Storage System Battery storage ยท the NY Power Authority |
47.1 MW | In study |
| Troy Heights Energy Storage Battery storage ยท Nexamp Solar LLC |
40.0 MW | In study |
| Sherburne Storage Battery storage ยท Nexamp Solar LLC |
40.0 MW | In study |
| Goldenrod Wind Onshore wind ยท Goldenrod Wind LLC |
39.0 MW | In study |
| Hoffman Falls Wind 2 Onshore wind ยท Liberty Renewables Inc. |
29.8 MW | In study |
| Oswego Clean Energy Solar ยท Oswego Clean Energy Holdings |
24.9 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)