United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESCompleted queue projects in ERCOT (Texas) — page 2
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Lacy Creek wind Wind + storage · Lacy Creek Wind, LLC |
301 MW | |
| Peregrine Solar Solar + storage · SP-Peregrine Solar LLC |
301 MW | |
| Inertia Wind Onshore wind · Inertia Wind Project, LLC |
301 MW | |
| Rodeo Ranch Energy Storage Other · Rodeo Ranch Energy Storage, LLC |
301 MW | |
| Torrecillas Wind Onshore wind · Nextera |
301 MW | |
| Jumbo Road Wind Onshore wind · TX Jumbo Road Wind, LLC |
300 MW | |
| Hickman Onshore wind · Invenergy |
300 MW | |
| Green Pastures W Onshore wind · Capital Dynamics |
300 MW | |
| Tahoka Wind Onshore wind · Lincoln Clean |
300 MW | |
| Prospero Solar*** Solar · Longroad Energy |
300 MW | |
| McAdoo Energy Center Onshore wind · Invenergy |
300 MW | |
| Sweetwater Wind 4 Onshore wind · DKR Wind Holdings LLC |
300 MW | |
| Ranchero Wind Onshore wind · Scout Clean Energy |
300 MW | |
| Oveja Wind Onshore wind · Invenergy |
300 MW | |
| Miami Wind 1 Project Onshore wind · Invenergy, LLC |
289 MW | |
| Gulf Wind 1 Onshore wind · Texas Gulf Wind LLC |
283 MW | |
| Noble Solar Solar · BT Noble Solar, LLC |
279 MW | |
| Quail Run Energy Center 2 Gas · Navasota Energy, LLC |
275 MW | |
| Colorado Bend Energy Center 1 Gas · Navasota Energy LLC |
275 MW | |
| Colorado Bend Energy Center 2 Gas · Navasota Energy, LLC |
275 MW | |
| Quail Run Energy Center 1 Coal · Navasota Energy LLC |
275 MW | |
| Las Majadas Wind Onshore wind · EDF Renewable Energy |
273 MW | |
| Titan Solar Solar · SE Titan, LLC |
270 MW | |
| BTE (Baytown Chiller) Gas · Calpine |
270 MW | |
| Tanzanite Storage Battery storage · Tanzanite Energy Storage LLC |
266 MW | |
| DeCordova BESS addition Other · Luminant Generation Company LLC |
263 MW | |
| CFB Power Plant Units 11&12 Coal · Formosa Plactics Corporation |
260 MW | |
| Goodnight Wind Onshore wind · FGE Goodnight I, LLC |
258 MW | |
| Wake Wind Onshore wind · Invenergy |
257 MW | |
| Stampede Solar Solar · Stampede Solar Project, LLC |
256 MW | |
| Taygete Solar Solar · 7x Energy |
255 MW | |
| Bosque Expansion Gas · Fulcrum Power Services |
255 MW | |
| Greasewood Solar Solar · Concho Bluff, LLC |
255 MW | |
| Mandorla Solar Solar · Ben Milam Solar 2 |
254 MW | |
| Halo Solar Solar · Ben Milam Solar 3 |
254 MW | |
| Pisgah Ridge Solar Solar · Pisgah Ridge Solar, LLC |
254 MW | |
| Texas Solar Nova Solar · TEXAS SOLAR NOVA 1, LLC |
254 MW | |
| Hopkins Solar Solar · Hopkins Energy LLC |
253 MW | |
| Sparta Solar Solar · Sparta Solar |
252 MW | |
| Sun Valley Solar Solar · Sun Valley Solar LLC |
252 MW | |
| Loraine Windpark Onshore wind · Third Planet Windpower LLC |
251 MW | |
| WKN Amadeus Wind Onshore wind · WKN |
250 MW | |
| Hidalgo & Starr Wind Onshore wind · EDP Renewables |
250 MW | |
| Dermott Wind 1 Onshore wind · Lincoln Clean |
250 MW | |
| Santacru Onshore wind · Enbridge |
250 MW | |
| Prospero Solar II Solar · Prospero Solar II, LLC |
250 MW | |
| Javelina Wind Onshore wind · Nextera |
250 MW | |
| Phoebe Solar Solar · Longroad Energy |
250 MW | |
| Galloway Solar Solar · 8minutenergy |
250 MW | |
| Airtricity Pyron Wind Farm Onshore wind · Airtricity, Inc |
249 MW |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- Southeast (non-ISO utilities)529 · 112.4 GW
- PJM (Mid-Atlantic, Midwest)1,192 · 97.6 GW
- ERCOT (Texas)613 · 95.3 GW
- MISO (Midcontinent)514 · 69.7 GW
- West (non-ISO utilities)963 · 64.7 GW
- SPP (Southwest Power Pool)299 · 45.1 GW
- CAISO (California)234 · 37.6 GW
- NYISO (New York)215 · 24.8 GW
- ISO-NE (New England)228 · 16.5 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)