United States βΊ Grid βΊ Interconnection queues
GAS Β· ERCOTBosque Expansion
Bosque Expansion is a 255 MW gas request built and operating in the ERCOT interconnection queue.
Request details
- Queue ID
- 08INR0046
- Grid region
- ERCOT (Texas)
- Developer
- Fulcrum Power Services
- Connection point (POI)
- BOSQ_BSQSU_118.000
- Technology
- Gas: 255 MW
- Total requested
- 255 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 29 January 2007
- Agreement signed
- 12 October 2007
- Proposed online date
- June 2000
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem