United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in PJM (Mid-Atlantic, Midwest) — page 19
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Decatur Battery Storage Battery storage · Decatur Storage LLC |
25.0 MW | Agreement signed |
| Solar project AH1-570 Solar · South Fork Solar, LLC |
25.0 MW | In study |
| Solar project AH2-266, Charles County Solar |
25.0 MW | In study |
| Battery storage project AH2-244, Allegheny County Battery storage |
25.0 MW | In study |
| Amelia Energy Facility Solar · Amelia Energy Facility, LLC |
25.0 MW | In study |
| Solar + storage project AG2-420, Venango County Solar + storage · Bear Oak Solar LLC |
25.0 MW | In study |
| Poseidon Solar 2 Solar · Poseidon Energy, LLC |
25.0 MW | In study |
| Onshore wind project AI2-400, Bureau County Onshore wind |
25.0 MW | In study |
| Battery storage project AH2-245, Allegheny County Battery storage |
25.0 MW | In study |
| Solar project AI2-013, Grundy County Solar |
24.1 MW | In study |
| Solar project AI2-154, Centre County Solar |
24.0 MW | In study |
| Solar project AI2-135, Mclean County Solar |
24.0 MW | In study |
| Gas project AH1-719, Washington County Gas · Washington Power Generation LLC |
24.0 MW | In study |
| Gas project AH1-686, Lawrence County Gas · Hanging Rock Power Company LLC |
24.0 MW | In study |
| Solar project AI2-169, Cass County Solar |
24.0 MW | In study |
| Solar project AI2-418, Allen County Solar |
24.0 MW | In study |
| Gas project AH1-704, Monroe County Gas · Long Ridge Energy Generation LLC |
24.0 MW | In study |
| Solar project AI2-340, Van Buren County Solar |
23.1 MW | In study |
| Solar project AI2-341, Marion County Solar |
22.8 MW | In study |
| Solar project AH1-059, Knox County Solar · Frasier Solar, LLC |
21.0 MW | In study |
| Solar project AI2-374, Bath County Solar |
20.6 MW | In study |
| Solar project AI2-415, Butler County Solar |
20.3 MW | In study |
| Concho Solar I Solar |
20.0 MW | Paused / redesign |
| Momentum Gratz Battery storage |
20.0 MW | Paused / redesign |
| Cedar Creek Solar Solar |
20.0 MW | Paused / redesign |
| Farmers Valley Solar Solar |
20.0 MW | Agreement signed |
| Battery storage project AG2-380, Queen Anne's County Battery storage · Concho Solar I, LLC |
20.0 MW | In study |
| Missouri Avenue Battery Storage Project Battery storage · Calpine Mid-Atlantic Development, LLC |
20.0 MW | Agreement signed |
| Battery storage project AH2-049, Somerset County Battery storage |
20.0 MW | In study |
| Mountain Holly Solar |
20.0 MW | Paused / redesign |
| Solar + storage project AI1-153, Dauphin County Solar + storage |
20.0 MW | In study |
| Battery storage project AH2-048, Northampton County Battery storage |
20.0 MW | In study |
| Solar project AH1-571 Solar · South Fork Solar, LLC |
20.0 MW | In study |
| Amelia Energy Facility Solar · Amelia Energy Facility, LLC |
20.0 MW | In study |
| Horsepen Branch Solar Solar + storage |
20.0 MW | Agreement signed |
| Reid Energy Center Battery storage · Reid Energy Center, LLC |
20.0 MW | In study |
| Calumet BESS Battery storage |
20.0 MW | Agreement signed |
| Solar project AH2-160, Highland County Solar |
20.0 MW | In study |
| Evergreen Energy Center Battery storage · Evergreen Energy Center, LLC |
20.0 MW | In study |
| Switchgrass Solar 1 Solar |
20.0 MW | Paused / redesign |
| Battery storage project AI2-010, Hanover County Battery storage |
20.0 MW | In study |
| Eaton OH Solar Solar |
20.0 MW | Agreement signed |
| Franklin Solar Solar |
20.0 MW | Agreement signed |
| Reedy Creek Solar + storage |
20.0 MW | Agreement signed |
| Solar project AH2-063, Beaver County Solar |
20.0 MW | In study |
| FR-Williamsport Solar |
20.0 MW | Agreement signed |
| Solar + storage project AI2-435, Berks County Solar + storage |
20.0 MW | In study |
| Rochelle Solar Solar |
20.0 MW | Agreement signed |
| Frosty Valley Energy Center Solar |
20.0 MW | Agreement signed |
| Walnut Solar I Solar |
20.0 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,857 · 519.1 GW
- ERCOT (Texas)1,986 · 447.3 GW
- MISO (Midcontinent)1,646 · 350.1 GW
- CAISO (California)429 · 188.6 GW
- Southeast (non-ISO utilities)1,067 · 161.4 GW
- SPP (Southwest Power Pool)692 · 152.4 GW
- PJM (Mid-Atlantic, Midwest)1,248 · 140.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)72 · 14.6 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)