🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Interconnection queue in PJM (Mid-Atlantic, Midwest) — page 19

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown1,248140.4 GW
Active in queue140.4 GW1,248 requests
Agreement signed35.0 GW343 requests
Withdrawn5,226638.1 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

1,248 requests · page 19 of 25
ProjectCapacityStatusLocationRegionQueuedOnline
Decatur Battery Storage
Battery storage · Decatur Storage LLC
25.0 MWAgreement signed Van Buren, MIPJM Aug 2020target 2029
Solar project AH1-570
Solar · South Fork Solar, LLC
25.0 MWIn study KYPJM Mar 2025target 2024
Solar project AH2-266, Charles County
Solar
25.0 MWIn study Charles, MDPJM Mar 2022target 2026
Battery storage project AH2-244, Allegheny County
Battery storage
25.0 MWIn study Allegheny, PAPJM Mar 2022target 2023
Amelia Energy Facility
Solar · Amelia Energy Facility, LLC
25.0 MWIn study Amelia, VAPJM Feb 2020target 2022
Solar + storage project AG2-420, Venango County
Solar + storage · Bear Oak Solar LLC
25.0 MWIn study Venango, PAPJM Mar 2025target 2023
Poseidon Solar 2
Solar · Poseidon Energy, LLC
25.0 MWIn study Fayette, PAPJM Feb 2025target 2024
Onshore wind project AI2-400, Bureau County
Onshore wind
25.0 MWIn study Bureau, ILPJM Mar 2023target 2025
Battery storage project AH2-245, Allegheny County
Battery storage
25.0 MWIn study Allegheny, PAPJM Mar 2022target 2023
Solar project AI2-013, Grundy County
Solar
24.1 MWIn study Grundy, ILPJM Nov 2022target 2026
Solar project AI2-154, Centre County
Solar
24.0 MWIn study Centre, PAPJM Mar 2023target 2025
Solar project AI2-135, Mclean County
Solar
24.0 MWIn study Mclean, ILPJM Feb 2023target 2025
Gas project AH1-719, Washington County
Gas · Washington Power Generation LLC
24.0 MWIn study Washington, OHPJM Apr 2025
Gas project AH1-686, Lawrence County
Gas · Hanging Rock Power Company LLC
24.0 MWIn study Lawrence, OHPJM Apr 2025
Solar project AI2-169, Cass County
Solar
24.0 MWIn study Cass, MIPJM Mar 2023target 2025
Solar project AI2-418, Allen County
Solar
24.0 MWIn study Allen, INPJM Mar 2023target 2026
Gas project AH1-704, Monroe County
Gas · Long Ridge Energy Generation LLC
24.0 MWIn study Monroe, OHPJM Apr 2025
Solar project AI2-340, Van Buren County
Solar
23.1 MWIn study Van Buren, MIPJM Mar 2023target 2025
Solar project AI2-341, Marion County
Solar
22.8 MWIn study Marion, OHPJM Mar 2023target 2024
Solar project AH1-059, Knox County
Solar · Frasier Solar, LLC
21.0 MWIn study Knox, OHPJM Mar 2025target 2024
Solar project AI2-374, Bath County
Solar
20.6 MWIn study Bath, KYPJM Mar 2023target 2025
Solar project AI2-415, Butler County
Solar
20.3 MWIn study Butler, PAPJM Mar 2023target 2026
Concho Solar I
Solar
20.0 MWPaused / redesign Queen Anne's, MDPJM May 2019target 2024
Momentum Gratz
Battery storage
20.0 MWPaused / redesign Dauphin, PAPJM Jun 2019target 2024
Cedar Creek Solar
Solar
20.0 MWPaused / redesign Kent, DEPJM Apr 2017target 2027
Farmers Valley Solar
Solar
20.0 MWAgreement signed Bradford, PAPJM Mar 2020target 2028
Battery storage project AG2-380, Queen Anne's County
Battery storage · Concho Solar I, LLC
20.0 MWIn study Queen Anne's, MDPJM Dec 2024target 2023
Missouri Avenue Battery Storage Project
Battery storage · Calpine Mid-Atlantic Development, LLC
20.0 MWAgreement signed Atlantic, NJPJM Nov 2019target 2028
Battery storage project AH2-049, Somerset County
Battery storage
20.0 MWIn study Somerset, MDPJM Dec 2021target 2025
Mountain Holly
Solar
20.0 MWPaused / redesign Columbia, PAPJM Mar 2019target 2027
Solar + storage project AI1-153, Dauphin County
Solar + storage
20.0 MWIn study Dauphin, PAPJM Sep 2022target 2027
Battery storage project AH2-048, Northampton County
Battery storage
20.0 MWIn study Northampton, VAPJM Dec 2021target 2025
Solar project AH1-571
Solar · South Fork Solar, LLC
20.0 MWIn study KYPJM Mar 2025target 2024
Amelia Energy Facility
Solar · Amelia Energy Facility, LLC
20.0 MWIn study Amelia, VAPJM May 2020target 2023
Horsepen Branch Solar
Solar + storage
20.0 MWAgreement signed Louisa, VAPJM Sep 2020target 2027
Reid Energy Center
Battery storage · Reid Energy Center, LLC
20.0 MWIn study Prince William, VAPJM Feb 2025target 2022
Calumet BESS
Battery storage
20.0 MWAgreement signed Cook, ILPJM Oct 2019target 2027
Solar project AH2-160, Highland County
Solar
20.0 MWIn study Highland, OHPJM Mar 2022target 2025
Evergreen Energy Center
Battery storage · Evergreen Energy Center, LLC
20.0 MWIn study Loudoun, VAPJM Feb 2025target 2022
Switchgrass Solar 1
Solar
20.0 MWPaused / redesign Accomack, VAPJM Feb 2020target 2025
Battery storage project AI2-010, Hanover County
Battery storage
20.0 MWIn study Hanover, VAPJM Nov 2022target 2025
Eaton OH Solar
Solar
20.0 MWAgreement signed Preble, OHPJM Feb 2017target 2027
Franklin Solar
Solar
20.0 MWAgreement signed Crawford, PAPJM Aug 2019target 2026
Reedy Creek
Solar + storage
20.0 MWAgreement signed Hanover, VAPJM Sep 2020target 2027
Solar project AH2-063, Beaver County
Solar
20.0 MWIn study Beaver, PAPJM Dec 2021target 2023
FR-Williamsport
Solar
20.0 MWAgreement signed Franklin, PAPJM Sep 2019target 2025
Solar + storage project AI2-435, Berks County
Solar + storage
20.0 MWIn study Berks, PAPJM Mar 2023target 2026
Rochelle Solar
Solar
20.0 MWAgreement signed Ogle, ILPJM Sep 2019target 2028
Frosty Valley Energy Center
Solar
20.0 MWAgreement signed Columbia, PAPJM Mar 2020target 2027
Walnut Solar I
Solar
20.0 MWAgreement signed King And Queen, VAPJM Mar 2017target 2026
Page 19 of 25

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)