United States β€Ί Grid β€Ί Interconnection queues β€Ί Kentucky

SOLAR Β· PJM

Solar project AH1-571

Solar project AH1-571 is a 20.0 MW solar request in interconnection study in the PJM interconnection queue, connecting to EKPC.

Queue statusIn planning
  1. PlanningQueued Mar 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2024 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
AH1-571
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
EKPC
Developer
South Fork Solar, LLC
Connection point (POI)
Millersburg 69 kV
Location
Kentucky
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Active
Entered queue
10 March 2025
Proposed online date
December 2024

Location

No county location in the queue data.

Power plants in Kentucky Β· Transmission lines in Kentucky

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem