GAS · PJM

Gas project AH1-719, Washington County

Gas project AH1-719, Washington County is a 24.0 MW gas request in interconnection study in the PJM interconnection queue, in Washington County, Ohio, connecting to AEP.

Queue statusIn planning
  1. PlanningQueued Apr 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
AH1-719
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Developer
Washington Power Generation LLC
Connection point (POI)
Beverly 345 kV
Location
Washington County, Ohio
Technology
Gas: 24.0 MW
Total requested
24.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Active
Entered queue
3 April 2025

Location

Marker shows the centre of Washington County; the queue data does not give exact sites.

Power plants in Ohio · Transmission lines in Ohio

Other requests in Washington County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem