🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Ohio

COAL · PJM

Muskingum River #5

Muskingum River #5 is a 15.0 MW coal request built and operating in the PJM interconnection queue, in Washington County, Ohio, connecting to AEP.

Queue statusOperating
  1. PlanningQueued Jan 2008 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingFeb 2008 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
T164
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Muskingum River
Location
Washington County, Ohio
Technology
Coal: 15.0 MW
Total requested
15.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
31 January 2008
Proposed online date
February 2008
Came online
February 2008

Location

Marker shows the centre of Washington County; the queue data does not give exact sites.

Power plants in Ohio · Transmission lines in Ohio

Other requests in Washington County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem