Washington Energy Facility

Washington Energy Facility is a 5.0 MW gas request built and operating in the PJM interconnection queue, in Washington County, Ohio, connecting to AEP.

Queue statusOperating
  1. PlanningQueued Jun 2014 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingNov 2015 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
AA1-014
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Washington 345kV
Location
Washington County, Ohio
Technology
Gas: 5.0 MW
Total requested
5.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
23 June 2014
Proposed online date
October 2015
Came online
November 2015

Location

Marker shows the centre of Washington County; the queue data does not give exact sites.

Power plants in Ohio · Transmission lines in Ohio

Other requests in Washington County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem