United States › Grid › Interconnection queues › Pennsylvania
SOLAR + STORAGE · PJMSolar + storage project AG2-420, Venango County
Solar + storage project AG2-420, Venango County is a 25.0 MW solar + storage request in interconnection study in the PJM interconnection queue, in Venango County, Pennsylvania, connecting to PENELEC.
- PlanningQueued Mar 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget May 2023 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AG2-420
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PENELEC
- Developer
- Bear Oak Solar LLC
- Connection point (POI)
- Eclipse #2 34.5 kV
- Location
- Venango County, Pennsylvania
- Technology
- Solar: 25.0 MW · Battery
- Total requested
- 25.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Active
- Entered queue
- 13 March 2025
- Proposed online date
- May 2023
Location
Marker shows the centre of Venango County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Venango County
- Battery storage project AI1-181, Venango CountyBattery storage · 140 MW · in study
- Solar project AI2-310, Venango CountySolar · 7.3 MW · in study
- Solar project AI2-057, Venango CountySolar · 6.6 MW · in study
- Solar project AI2-312, Venango CountySolar · 5.5 MW · in study
- Handsome LakeGas · 20.0 MW · built
- Cardinal SolarSolar · 18.9 MW · built
- Gas project AA1-045, Venango CountyGas · 308 MW · withdrawn
- Gas project B43, Venango CountyGas · 284 MW · withdrawn
- Solar + storage project AF1-304, Venango CountySolar + storage · 100 MW · withdrawn
- Solar project AE1-169, Venango CountySolar · 85.0 MW · withdrawn
- Solar project AF2-164, Venango CountySolar · 80.0 MW · withdrawn
- Solar project AH1-050, Venango CountySolar · 50.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem