United States › Grid › Interconnection queues › California
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in California — page 17
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Cannae Solar + storage |
234 MW | Withdrawn / abandoned |
| Alba Solar + storage |
233 MW | Withdrawn / abandoned |
| Helios Secondus Solar |
232 MW | Withdrawn / abandoned |
| Solitude Hybrid Solar + storage |
232 MW | Withdrawn / abandoned |
| Blue Bird Solar + storage |
232 MW | Withdrawn / abandoned |
| Willow Springs Solar Generating Station Solar |
231 MW | Withdrawn / abandoned |
| Suntower Gaskell Generating Station Solar |
231 MW | Withdrawn / abandoned |
| Trigo Solar + storage |
230 MW | Withdrawn / abandoned |
| Irrigosa Solar + storage |
230 MW | Withdrawn / abandoned |
| River Bluff Solar Energy Park Solar |
230 MW | Withdrawn / abandoned |
| Battery storage project 21, Sacramento County Battery storage |
230 MW | Withdrawn / abandoned |
| Hallows Battery storage |
230 MW | Withdrawn / abandoned |
| Sagebrush 6 Hybrid Solar + storage |
230 MW | Withdrawn / abandoned |
| Allium Solar + storage |
229 MW | Withdrawn / abandoned |
| Shavers Valley Wind Farm Onshore wind |
228 MW | Withdrawn / abandoned |
| Allegro Hybrid Solar Solar + storage |
227 MW | Withdrawn / abandoned |
| Mule Car Battery storage |
227 MW | Withdrawn / abandoned |
| Lacuna Energy Storage Battery storage |
227 MW | Withdrawn / abandoned |
| Flyway Solar Solar + storage |
227 MW | Withdrawn / abandoned |
| Elbow Gas |
225 MW | Withdrawn / abandoned |
| Stoneman Battery storage |
225 MW | Withdrawn / abandoned |
| Beauchamp 2 Solar Solar + storage |
225 MW | Withdrawn / abandoned |
| Sagebrush Solar 5 Solar |
224 MW | Withdrawn / abandoned |
| SP Blythe 1 Solar |
221 MW | Withdrawn / abandoned |
| Angeles Energy Storage Battery storage |
220 MW | Withdrawn / abandoned |
| Harbor II Gas |
220 MW | Withdrawn / abandoned |
| Placer Solar PV I Solar |
220 MW | Withdrawn / abandoned |
| California Solar One Solar |
220 MW | Withdrawn / abandoned |
| Hood 2 Solar |
220 MW | Withdrawn / abandoned |
| Johanna Energy Center (Fka Johanna Energy Center LMS) Gas |
220 MW | Withdrawn / abandoned |
| Hood 3 Solar |
220 MW | Withdrawn / abandoned |
| Madera Solar PV I (Fka Wheeler Ridge Solar PV1) Solar |
220 MW | Withdrawn / abandoned |
| Rangeland Solar Solar + storage |
217 MW | Withdrawn / abandoned |
| Myrtle Solar + storage |
216 MW | Withdrawn / abandoned |
| Tumey Hills Solar Battery storage |
216 MW | Withdrawn / abandoned |
| Tumey Hills Energy Storage Battery storage |
216 MW | Withdrawn / abandoned |
| Brooks Solar + storage |
215 MW | Withdrawn / abandoned |
| Cuesta Solar + storage |
215 MW | Withdrawn / abandoned |
| Minden Solar + storage |
215 MW | Withdrawn / abandoned |
| Winter Harvest Solar + storage |
215 MW | Withdrawn / abandoned |
| Zinc BESS Battery storage |
214 MW | Withdrawn / abandoned |
| Feather Energy Storage Battery storage |
214 MW | Withdrawn / abandoned |
| Salt Flat Energy Storage Battery storage |
214 MW | Withdrawn / abandoned |
| Sunridge Storage Battery storage |
214 MW | Withdrawn / abandoned |
| Goldenstar Energy Storage Battery storage |
214 MW | Withdrawn / abandoned |
| Timber Energy Storage Battery storage |
214 MW | Withdrawn / abandoned |
| Blitz Energy Storage Battery storage |
214 MW | Withdrawn / abandoned |
| Stageline Energy Storage Battery storage |
214 MW | Withdrawn / abandoned |
| Flea Flicker Energy Storage Battery storage |
214 MW | Withdrawn / abandoned |
| Brix Energy Storage Battery storage |
214 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)