United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in CAISO (California) — page 15
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| San Luis Obispo Solar I Solar |
300 MW | Withdrawn / abandoned |
| Miranda ESS 2 Battery storage |
300 MW | Withdrawn / abandoned |
| Clover Energy Storage Plant Battery storage |
300 MW | Withdrawn / abandoned |
| Amethyst Solar Solar + storage |
300 MW | Withdrawn / abandoned |
| Swan ESS Battery storage |
300 MW | Withdrawn / abandoned |
| Mavericks Battery storage |
300 MW | Withdrawn / abandoned |
| LSP Oakland Gas |
300 MW | Withdrawn / abandoned |
| Alamitos Energy Storage Battery storage |
300 MW | Withdrawn / abandoned |
| Arco Solar Station Solar |
300 MW | Withdrawn / abandoned |
| Cathode Battery storage |
300 MW | Withdrawn / abandoned |
| GYPSY ESS 2 Battery storage |
300 MW | Withdrawn / abandoned |
| Hyder Solar |
300 MW | Withdrawn / abandoned |
| Tenaska Mountain Basin Gas |
300 MW | Withdrawn / abandoned |
| Fontana Energy Center Gas |
300 MW | Withdrawn / abandoned |
| Barren Ridge II Alternative Onshore wind |
300 MW | Withdrawn / abandoned |
| Ses Solar Two) Solar |
300 MW | Withdrawn / abandoned |
| Enn Mojave Power 3 Other |
300 MW | Withdrawn / abandoned |
| CVH Power I Solar |
300 MW | Withdrawn / abandoned |
| Gravel Hills Wind & Solar Other |
300 MW | Withdrawn / abandoned |
| Beltran Solar Solar |
300 MW | Withdrawn / abandoned |
| Homer Mountain Wind Farm Onshore wind |
300 MW | Withdrawn / abandoned |
| Tule II Onshore wind |
300 MW | Withdrawn / abandoned |
| Titan Solar Gas |
300 MW | Withdrawn / abandoned |
| New Heca Gas |
300 MW | Withdrawn / abandoned |
| CPV North City Gas |
300 MW | Withdrawn / abandoned |
| Chia ESS Battery storage |
300 MW | Withdrawn / abandoned |
| Wellhead Power Mccall Gas |
300 MW | Withdrawn / abandoned |
| Boulder Solar Power Solar |
300 MW | Withdrawn / abandoned |
| Heca SCS Other |
300 MW | Withdrawn / abandoned |
| Viva Energy Storage Battery storage |
300 MW | Withdrawn / abandoned |
| Re Oasis Solar |
300 MW | Withdrawn / abandoned |
| Lone Tree Wind Onshore wind |
299 MW | Withdrawn / abandoned |
| Loop Ranch Wind Onshore wind |
299 MW | Withdrawn / abandoned |
| Highwind Power Project Gas |
291 MW | Withdrawn / abandoned |
| Mesquite Hills Solar Project Solar |
290 MW | Withdrawn / abandoned |
| Wre - Schindler Other |
289 MW | Withdrawn / abandoned |
| Wre - Panoche Other |
289 MW | Withdrawn / abandoned |
| Wre - Mendota Solar |
289 MW | Withdrawn / abandoned |
| South Ridge Solar Solar + storage |
284 MW | Withdrawn / abandoned |
| Eon Vision Wind Onshore wind |
281 MW | Withdrawn / abandoned |
| Vision Wind Onshore wind |
281 MW | Withdrawn / abandoned |
| Saguaro Battery storage |
280 MW | Withdrawn / abandoned |
| Imperial Solar 1 Solar |
280 MW | Withdrawn / abandoned |
| Palen Valley Solar 1 Solar |
280 MW | Withdrawn / abandoned |
| Suncup Battery storage |
280 MW | Withdrawn / abandoned |
| Ludlow Solar 1 Solar |
280 MW | Withdrawn / abandoned |
| Mccoy Solar 1 Solar |
280 MW | Withdrawn / abandoned |
| Desert Paintbrush Battery storage |
280 MW | Withdrawn / abandoned |
| Gran Vista Solar + storage |
279 MW | Withdrawn / abandoned |
| Copper MTN Solar 5 Solar + storage |
277 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)