Withdrawn queue requests in CAISO (California) — page 15

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2,186619.9 GW
Active in queue188.6 GW429 requests
Agreement signed96.2 GW235 requests
Withdrawn2,186619.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2,186 requests · page 15 of 44
ProjectCapacityStatusLocationRegionQueuedOnline
San Luis Obispo Solar I
Solar
300 MWWithdrawn / abandoned Kern, CACAISO Jun 2006target 2010
Miranda ESS 2
Battery storage
300 MWWithdrawn / abandoned Santa Clara, CACAISO Apr 2020target 2024
Clover Energy Storage Plant
Battery storage
300 MWWithdrawn / abandoned Los Angeles, CACAISO May 2016target 2023
Amethyst Solar
Solar + storage
300 MWWithdrawn / abandoned Riverside, CACAISO Apr 2020target 2023
Swan ESS
Battery storage
300 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2020target 2025
Mavericks
Battery storage
300 MWWithdrawn / abandoned Alameda, CACAISO Apr 2018target 2021
LSP Oakland
Gas
300 MWWithdrawn / abandoned Alameda, CACAISO Dec 2006target 2012
Alamitos Energy Storage
Battery storage
300 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2014target 2018
Arco Solar Station
Solar
300 MWWithdrawn / abandoned Kern, CACAISO Jul 2010target 2014
Cathode
Battery storage
300 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2021target 2024
GYPSY ESS 2
Battery storage
300 MWWithdrawn / abandoned San Diego, CACAISO Apr 2020target 2024
Hyder
Solar
300 MWWithdrawn / abandoned Maricopa, AZCAISO May 2008target 2012
Tenaska Mountain Basin
Gas
300 MWWithdrawn / abandoned Kern, CACAISO Apr 2012target 2016
Fontana Energy Center
Gas
300 MWWithdrawn / abandoned San Bernardino, CACAISO Oct 2006target 2010
Barren Ridge II Alternative
Onshore wind
300 MWWithdrawn / abandoned Kern, CACAISO Aug 2005target 2007
Ses Solar Two)
Solar
300 MWWithdrawn / abandoned Imperial, CACAISO Aug 2005target 2012
Enn Mojave Power 3
Other
300 MWWithdrawn / abandoned Clark, NVCAISO Apr 2012target 2016
CVH Power I
Solar
300 MWWithdrawn / abandoned Maricopa, AZCAISO Mar 2011target 2014
Gravel Hills Wind & Solar
Other
300 MWWithdrawn / abandoned Kern, CACAISO Apr 2021target 2025
Beltran Solar
Solar
300 MWWithdrawn / abandoned Stanislaus, CACAISO Apr 2015target 2018
Homer Mountain Wind Farm
Onshore wind
300 MWWithdrawn / abandoned San Bernardino, CACAISO Oct 2007target 2010
Tule II
Onshore wind
300 MWWithdrawn / abandoned San Diego, CACAISO Jun 2006target 2008
Titan Solar
Gas
300 MWWithdrawn / abandoned Maricopa, AZCAISO Apr 2015target 2020
New Heca
Gas
300 MWWithdrawn / abandoned Kern, CACAISO Apr 2014target 2020
CPV North City
Gas
300 MWWithdrawn / abandoned San Diego, CACAISO Mar 2011target 2015
Chia ESS
Battery storage
300 MWWithdrawn / abandoned Alameda, CACAISO Apr 2020target 2025
Wellhead Power Mccall
Gas
300 MWWithdrawn / abandoned Fresno, CACAISO Nov 2004target 2013
Boulder Solar Power
Solar
300 MWWithdrawn / abandoned Clark, NVCAISO Apr 2012target 2016
Heca SCS
Other
300 MWWithdrawn / abandoned Kern, CACAISO Apr 2013target 2019
Viva Energy Storage
Battery storage
300 MWWithdrawn / abandoned CACAISO Apr 2023target 2030
Re Oasis
Solar
300 MWWithdrawn / abandoned Riverside, CACAISO Mar 2011target 2014
Lone Tree Wind
Onshore wind
299 MWWithdrawn / abandoned Alameda, CACAISO Mar 2011target 2013
Loop Ranch Wind
Onshore wind
299 MWWithdrawn / abandoned Kern, CACAISO Mar 2011target 2013
Highwind Power Project
Gas
291 MWWithdrawn / abandoned Kern, CACAISO Apr 2012target 2017
Mesquite Hills Solar Project
Solar
290 MWWithdrawn / abandoned San Bernardino, CACAISO May 2008target 2013
Wre - Schindler
Other
289 MWWithdrawn / abandoned Fresno, CACAISO Jul 2010target 2017
Wre - Panoche
Other
289 MWWithdrawn / abandoned Fresno, CACAISO Jul 2010target 2017
Wre - Mendota
Solar
289 MWWithdrawn / abandoned Fresno, CACAISO Jul 2010target 2017
South Ridge Solar
Solar + storage
284 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Eon Vision Wind
Onshore wind
281 MWWithdrawn / abandoned Kern, CACAISO May 2016target 2019
Vision Wind
Onshore wind
281 MWWithdrawn / abandoned Kern, CACAISO May 2017target 2023
Saguaro
Battery storage
280 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Imperial Solar 1
Solar
280 MWWithdrawn / abandoned Imperial, CACAISO May 2008target 2012
Palen Valley Solar 1
Solar
280 MWWithdrawn / abandoned Riverside, CACAISO May 2008target 2012
Suncup
Battery storage
280 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Ludlow Solar 1
Solar
280 MWWithdrawn / abandoned San Bernardino, CACAISO May 2008target 2012
Mccoy Solar 1
Solar
280 MWWithdrawn / abandoned Riverside, CACAISO May 2008target 2012
Desert Paintbrush
Battery storage
280 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Gran Vista
Solar + storage
279 MWWithdrawn / abandoned Kern, CACAISO Apr 2011target 2024
Copper MTN Solar 5
Solar + storage
277 MWWithdrawn / abandoned Clark, NVCAISO May 2016target 2023
Page 15 of 44

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)