United States β€Ί Grid β€Ί Interconnection queues β€Ί California

GAS Β· CAISO

LSP Oakland

LSP Oakland is a 300 MW gas request withdrawn in the CAISO interconnection queue, in Alameda County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2006 (completed)
  2. Withdrawn / abandonedJan 2009 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
155
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Oakland C 115kV substation
Location
Alameda County, California
Technology
Gas: 300 MW
Total requested
300 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
1 December 2006
Proposed online date
May 2012
Withdrawn
January 2009

Location

Marker shows the centre of Alameda County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Alameda County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem