🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › California

SOLAR · CAISO

Mesquite Hills Solar Project

Mesquite Hills Solar Project is a 290 MW solar request withdrawn in the CAISO interconnection queue, in San Bernardino County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2008 (completed)
  2. Withdrawn / abandonedDec 2009 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
382
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Lugo-Eldorado 500 kV line
Location
San Bernardino County, California
Technology
Solar: 290 MW
Total requested
290 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
29 May 2008
Proposed online date
May 2013
Withdrawn
December 2009

Location

Marker shows the centre of San Bernardino County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Bernardino County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem