Mccoy Solar 1

Mccoy Solar 1 is a 280 MW solar request withdrawn in the CAISO interconnection queue, in Riverside County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2008 (completed)
  2. Withdrawn / abandonedNov 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
416
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Midpoint Substation 230 kV
Location
Riverside County, California
Technology
Solar: 280 MW
Total requested
280 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 May 2008
Proposed online date
August 2012
Withdrawn
November 2008

Location

Marker shows the centre of Riverside County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Riverside County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem