United States β€Ί Grid β€Ί Interconnection queues β€Ί California

SOLAR Β· CAISO

Wre - Mendota

Wre - Mendota is a 289 MW solar request withdrawn in the CAISO interconnection queue, in Fresno County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2010 (completed)
  2. Withdrawn / abandonedSep 2011 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
643K
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Mendota-San Joaquin-Helm 70 kV
Location
Fresno County, California
Technology
Solar: 289 MW
Total requested
289 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
31 July 2010
Proposed online date
April 2017
Withdrawn
September 2011

Location

Marker shows the centre of Fresno County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Fresno County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem