San Luis Obispo Solar I

San Luis Obispo Solar I is a 300 MW solar request withdrawn in the CAISO interconnection queue, in Kern County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2006 (completed)
  2. Withdrawn / abandonedNov 2006 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
108A
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Morro Bay - Midway 230kV line
Location
Kern County, California
Technology
Solar: 300 MW
Total requested
300 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
14 June 2006
Proposed online date
March 2010
Withdrawn
November 2006

Location

Marker shows the centre of Kern County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Kern County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem