United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in the USA — page 130
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project AH2-163, Armstrong County Solar |
19.8 MW | In study |
| Norwegian Solar Solar |
19.8 MW | Paused / redesign |
| Cedar Creek Solar Solar |
19.8 MW | Paused / redesign |
| Geothermal project 25N-SG2, Pershing County Geothermal |
19.8 MW | In study |
| Solar project AI1-076, Delaware County Solar |
19.8 MW | In study |
| Solar project AH1-397, King And Queen County Solar · Ameresco Inc |
19.7 MW | In study |
| Solar project AG2-625, Warren County Solar · Chamberlain West Solar Farm LLC |
19.6 MW | In study |
| Solar project AH2-096, Dorchester County Solar |
19.5 MW | In study |
| Solar project 123, Polk County Solar |
19.5 MW | In study |
| Solar project AH1-033, Currituck County Solar · Sligo Solar, LLC |
19.5 MW | In study |
| Solar project AI2-403, Dekalb County Solar |
19.5 MW | In study |
| Solar + storage project AI1-175, Marion County Solar + storage |
19.5 MW | In study |
| Heritage Solar Farm Solar · Heritage Solar Farm, LLC |
19.3 MW | In study |
| Battery Storage Battery storage |
19.3 MW | In study |
| Battery Storage Battery storage |
19.3 MW | In study |
| Gas project 796, Elmore County Gas |
19.3 MW | In study |
| Gas project 797, Twin Falls County Gas |
19.3 MW | In study |
| Port Belford Solar Farm Solar · Port Belford Solar Farm, LLC |
19.3 MW | In study |
| Kober Solar Farm Solar · CEP NJ KOBER LAND LLC |
19.3 MW | In study |
| Solar project AI2-397, Preble County Solar |
19.2 MW | In study |
| Solar project AG2-297, Cumberland County Solar · Calpine Mid-Atlantic Development, LLC |
19.0 MW | In study |
| Onshore wind project G0975, Umatilla County Onshore wind |
19.0 MW | In study |
| Gas project LGE-CS2025-011, Trimble County Gas |
19.0 MW | In study |
| Solar + storage project AG2-192, Grant County Solar + storage · BR Solar Sheriff 2 LLC |
19.0 MW | In study |
| Solar + storage project 80, Spokane County Solar + storage |
19.0 MW | In study |
| Gas project LGE-CS2025-012, Trimble County Gas |
19.0 MW | In study |
| Gas project AI2-020, Warren County Gas |
19.0 MW | In study |
| Solar project AH2-041, Monongalia County Solar |
18.9 MW | In study |
| Cedar Creek Solar Solar |
18.8 MW | Paused / redesign |
| Other project 07-018, Jefferson County Other |
18.5 MW | Paused / redesign |
| Other project 09-034, Jefferson County Other |
18.5 MW | Paused / redesign |
| Shannon Wind Repower Onshore wind · Shannon Wind, LLC |
18.5 MW | In study |
| Solar project AI2-215, Cass County Solar |
18.1 MW | In study |
| Scipio Solar Solar · Scipio Solar NY LLC |
18.0 MW | In study |
| Buzzi Maryneal Wind Project Onshore wind · Buzzi Unicem USA |
18.0 MW | In study |
| Midlothian 4 repower Gas · MIDLOTHIAN ENERGY, LLC |
18.0 MW | In study |
| Jarratt Energy Facility 2 Solar · Jarratt Energy Facility, LLC |
18.0 MW | In study |
| Midlothian Unit 2 repower Gas · MIDLOTHIAN ENERGY, LLC |
18.0 MW | In study |
| Solar project AH1-667, Clearfield County Solar · CL-Shiloh LLC |
18.0 MW | In study |
| Hydro project 476, Lyon County Hydro |
18.0 MW | In study |
| Gas project 196, Anderson County Gas |
18.0 MW | In study |
| Solar project AI2-345, Amherst County Solar |
18.0 MW | In study |
| Hays Energy Unit 2 Repower Gas · HAYS ENERGY, LLC |
18.0 MW | In study |
| Gas project 198, Anderson County Gas |
18.0 MW | In study |
| Gas project 197, Anderson County Gas |
18.0 MW | In study |
| Gas project 195, Anderson County Gas |
18.0 MW | In study |
| Hays Energy Unit 3 Repower Gas · HAYS ENERGY, LLC |
18.0 MW | In study |
| Other project J2116, Cook County Other |
18.0 MW | In study |
| Battery storage project AH2-127, Burlington County Battery storage |
18.0 MW | In study |
| Offshore wind Inc (QP700) Offshore wind |
18.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,496 · 455.6 GW
- ERCOT (Texas)1,408 · 328.0 GW
- MISO (Midcontinent)1,337 · 302.2 GW
- Southeast (non-ISO utilities)815 · 118.5 GW
- SPP (Southwest Power Pool)480 · 114.8 GW
- PJM (Mid-Atlantic, Midwest)905 · 105.4 GW
- CAISO (California)194 · 92.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)27 · 6,015 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)