United States › Grid › Interconnection queues › Minnesota
OTHER · MISOOther project J2116, Cook County
Other project J2116, Cook County is a 18.0 MW other request in interconnection study in the MISO interconnection queue, in Cook County, Minnesota, connecting to GREAT RIVER ENERGY.
Queue statusIn planning
- PlanningQueued Dec 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Sep 2022 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J2116
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- GREAT RIVER ENERGY
- Connection point (POI)
- COVIL
- Location
- Cook County, Minnesota
- Technology
- Diesel: 18.0 MW
- Total requested
- 18.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 3; Post GIA Status: Not Started
- Queue status
- Active
- Entered queue
- 8 December 2023
- Proposed online date
- September 2022
Location
Marker shows the centre of Cook County; the queue data does not give exact sites.
Other requests in Cook County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem