United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in the USA — page 125
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project AI2-410, Dekalb County Solar |
28.5 MW | In study |
| Solar project AH2-379, Worcester County Solar |
28.3 MW | In study |
| Coal project GI-43, Randolph County Coal |
28.2 MW | In study |
| Gas project 956971, Rowan County Gas |
28.0 MW | In study |
| Other project GI-2021-144, Imperial County Other |
28.0 MW | In study |
| Gas project 956974, Rockingham County Gas |
28.0 MW | In study |
| Onshore wind project PIS053, Carbon County Onshore wind · PacifiCorp |
28.0 MW | In study |
| Solar project AI2-424, Huntington County Solar |
28.0 MW | In study |
| Hillboro Wind Wind + storage · Abei Energy Green XI LLC |
27.8 MW | In study |
| Gas project IC-1012, Autauga County Gas |
27.0 MW | In study |
| Gas project G0620, Umatilla County Gas |
27.0 MW | In study |
| Zeus Rusk Solar Solar + storage · Rusk Solar, LLC |
26.8 MW | In study |
| Solar project AI2-339, Nicholas County Solar |
26.8 MW | In study |
| Solar project AI2-427, Licking County Solar |
26.4 MW | In study |
| Fowler Ranch Storage Battery storage · Crane BESS, LLC |
26.1 MW | In study |
| Solar project 957449, Greenwood County Solar |
26.1 MW | In study |
| 360 Solar Center, LLC Solar · 360 Solar Center, LLC |
26.0 MW | In study |
| 360 Solar Center, LLC Solar · 360 Solar Center, LLC |
26.0 MW | In study |
| Blue Creek Wind Farm Solar |
26.0 MW | Paused / redesign |
| Onshore wind project PIS050, Carbon County Onshore wind · PacifiCorp |
26.0 MW | In study |
| Solar project AH2-263, Marion County Solar |
25.8 MW | In study |
| NET Power Demonstration plant Gas · NET Power LLC |
25.5 MW | In study |
| Kennedy Storage Solar + storage · Kennedy Bypass Solar LLC |
25.3 MW | In study |
| Burro Loco Energy Storage Battery storage · VESI |
25.1 MW | In study |
| Solar project AH1-570 Solar · South Fork Solar, LLC |
25.0 MW | In study |
| Solar project 957084, Darlington County Solar |
25.0 MW | In study |
| Solar project AH2-266, Charles County Solar |
25.0 MW | In study |
| Solar project T2-079, Jefferson County Solar |
25.0 MW | In study |
| Fluorite Solar Solar |
25.0 MW | Paused / redesign |
| Surplus; J1188 Other |
25.0 MW | In study |
| Other project PP00053, Darlington County Other |
25.0 MW | In study |
| Battery storage project AH2-244, Allegheny County Battery storage |
25.0 MW | In study |
| Surplus; J1000 Other |
25.0 MW | In study |
| Onshore wind project G0827, Sherman County Onshore wind |
25.0 MW | In study |
| Surplus; J1305 Other |
25.0 MW | In study |
| Gas project 25-IC-1316, Kemper County Gas |
25.0 MW | In study |
| Amelia Energy Facility Solar · Amelia Energy Facility, LLC |
25.0 MW | In study |
| Knickerbocker Storage Other · Knickerbocker Solar LLC |
25.0 MW | Paused / redesign |
| Solar + storage project AG2-420, Venango County Solar + storage · Bear Oak Solar LLC |
25.0 MW | In study |
| Battery storage project J1982, Gladwin County Battery storage |
25.0 MW | In study |
| Poseidon Solar 2 Solar · Poseidon Energy, LLC |
25.0 MW | In study |
| Solar Solar |
25.0 MW | In study |
| Nuclear project 627, Hamilton County Nuclear |
25.0 MW | In study |
| Gas project T2-018, Utah County Gas · PacifiCorp |
25.0 MW | In study |
| Surplus; J864 Other |
25.0 MW | In study |
| Battery storage project G0832, Snohomish County Battery storage |
25.0 MW | In study |
| Onshore wind project AI2-400, Bureau County Onshore wind |
25.0 MW | In study |
| Battery storage project AH2-245, Allegheny County Battery storage |
25.0 MW | In study |
| Oswego Clean Energy Solar · Oswego Clean Energy Holdings |
24.9 MW | In study |
| Solar + storage project T2-078, Modoc County Solar + storage |
24.9 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,496 · 455.6 GW
- ERCOT (Texas)1,408 · 328.0 GW
- MISO (Midcontinent)1,337 · 302.2 GW
- Southeast (non-ISO utilities)815 · 118.5 GW
- SPP (Southwest Power Pool)480 · 114.8 GW
- PJM (Mid-Atlantic, Midwest)905 · 105.4 GW
- CAISO (California)194 · 92.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)27 · 6,015 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)