Solar project 957449, Greenwood County

Solar project 957449, Greenwood County is a 26.1 MW solar request in interconnection study in the Southeast interconnection queue, in Greenwood County, South Carolina, connecting to Duke Energy Carolinas.

Queue statusIn planning
  1. PlanningQueued Jun 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
957449
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Duke Energy Carolinas
Connection point (POI)
Florida
Location
Greenwood County, South Carolina
Technology
Solar: 26.1 MW
Total requested
26.1 MW
Service type
Energy only (ERIS)
Study phase
Phase 3 Cluster Study - Study Complete
Queue status
Active
Entered queue
28 June 2024

Location

Marker shows the centre of Greenwood County; the queue data does not give exact sites.

Power plants in South Carolina · Transmission lines in South Carolina

Other requests in Greenwood County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem