United States › Grid › Interconnection queues › South Carolina

BATTERY STORAGE · SOUTHEAST

Battery storage project 977315, Greenwood County

Battery storage project 977315, Greenwood County is a 99.0 MW battery storage request in interconnection study in the Southeast interconnection queue, in Greenwood County, South Carolina, connecting to Duke Energy Carolinas.

Queue statusIn planning
  1. PlanningQueued Jun 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
977315
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Duke Energy Carolinas
Connection point (POI)
CHAMPION Wh 100 kV
Location
Greenwood County, South Carolina
Technology
Battery: 99.0 MW
Total requested
99.0 MW
Service type
NRIS and ERIS
Study phase
Phase 1 Cluster Study - Study Complete
Queue status
Active
Entered queue
18 June 2025

Location

Marker shows the centre of Greenwood County; the queue data does not give exact sites.

Power plants in South Carolina · Transmission lines in South Carolina

Other requests in Greenwood County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem