SOLAR · SOUTHEASTSolar project 572280, Greenwood County
Solar project 572280, Greenwood County is a 72.0 MW solar request with a signed interconnection agreement in the Southeast interconnection queue, in Greenwood County, South Carolina, connecting to Duke Energy Carolinas.
Queue statusConsented
- PlanningQueued Jun 2022 (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingTarget Mar 2028 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- 572280
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Carolinas
- Connection point (POI)
- Champion Bl 100 kV
- Location
- Greenwood County, South Carolina
- Technology
- Solar: 72.0 MW
- Total requested
- 72.0 MW
- Service type
- Other
- Study phase
- Engineering Design - In Progress
- Queue status
- Active
- Entered queue
- 28 June 2022
- Proposed online date
- March 2028
Location
Marker shows the centre of Greenwood County; the queue data does not give exact sites.
Power plants in South Carolina · Transmission lines in South Carolina
Other requests in Greenwood County
- Solar project 126066, Greenwood CountySolar · 34.0 MW · agreement signed
- Battery storage project 977315, Greenwood CountyBattery storage · 99.0 MW · in study
- Solar project 957449, Greenwood CountySolar · 26.1 MW · in study
- Solar project 977885, Greenwood CountySolar · 19.9 MW · in study
- Solar project 968499, Greenwood CountySolar · 2.0 MW · in study
- Battery storage project 568550, Greenwood CountyBattery storage · 197 MW · withdrawn
- Solar project 917547, Greenwood CountySolar · 75.0 MW · withdrawn
- Solar project 70688, Greenwood CountySolar · 75.0 MW · withdrawn
- Solar project 120, Greenwood CountySolar · 75.0 MW · withdrawn
- Solar project 569242, Greenwood CountySolar · 74.9 MW · withdrawn
- Solar project 566468, Greenwood CountySolar · 74.9 MW · withdrawn
- Solar project 962624, Greenwood CountySolar · 74.9 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem