United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Queue requests in study in the USA — page 116

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown6,8521,550.1 GW
Active in queue2,001.0 GW9,187 requests
Agreement signed423.2 GW2,141 requests
Withdrawn24,2054,519.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6,852 requests · page 116 of 138
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project AG2-617, Anne Arundel County
Solar · Dairy Farm Solar, L.L.C.
55.0 MWIn study Anne Arundel, MDPJM Mar 2025target 2023
Solar + storage project GEN-2024-220, Caddo Parish County
Solar + storage
55.0 MWIn study Caddo Parish, LASPP Mar 2025target 2030
Battery storage project S0030, Crook County
Battery storage
55.0 MWIn study Crook, ORWest Feb 2024target 2026
Bluestem Solar
Battery storage · RWE Solar Development, LLC
55.0 MWIn study Laporte, INPJM Sep 2020target 2023
Surplus; J928
Other
55.0 MWIn study Delta, MIMISO Apr 2022target 2025
Solar project AI2-224, Charlotte County
Solar
55.0 MWIn study Charlotte, VAPJM Mar 2023target 2025
Solar project 239, Marion County
Solar
55.0 MWIn study Marion, SCSoutheast Jun 2023target 2027
Other project Q608, Pinal County
Other
55.0 MWIn study Pinal, AZWest May 2025target 2028
Battery storage project AH2-061, Prince William County
Battery storage
55.0 MWIn study Prince William, VAPJM Dec 2021target 2028
Solar project AG2-585, Kankakee County
Solar · Grand Marsh Solar 2, LLC
55.0 MWIn study Kankakee, ILPJM Mar 2025target 2024
Gas project T2-019, Utah County
Gas · PacifiCorp
55.0 MWIn study Utah, UTWest Aug 2025target 2028
Replacing 55 MW with 29 MW Natural Gas/Fuel Oil; Blue Lake Unit 3
Gas
55.0 MWIn study Scott, MNMISO May 2024target 2025
Dover Solar
Solar
55.0 MWPaused / redesign York, PAPJM Mar 2019target 2026
Battery storage project 313, Williamsburg County
Battery storage
55.0 MWIn study Williamsburg, SCSoutheast Jun 2025target 2029
Battery storage project AH2-060, Prince William County
Battery storage
55.0 MWIn study Prince William, VAPJM Dec 2021target 2027
Silver Hills Windpower
Onshore wind · Silver Hills Windpower, LLC
54.1 MWIn study Howard, TXERCOT Apr 2025target 2029
Geothermal project G1078, Deschutes County
Geothermal
54.0 MWIn study Deschutes, ORWest Jun 2025target 2030
Gas project 656, Benton County
Gas
54.0 MWIn study Benton, MSSoutheast Oct 2024target 2030
Donna BESS
Solar + storage · Donna Solar LLC
53.9 MWIn study Hidalgo, TXERCOT Mar 2024target 2029
Paloma Energy Center BESS
Solar + storage · Harrison Street Development, LLC
53.6 MWIn study Colorado, TXERCOT Feb 2024target 2027
Gas project AH1-744, Prince George's County
Gas · Parkway Generation Operating LLC
53.5 MWIn study Prince George's, MDPJM Apr 2025
Wagon Timber Storage
Solar + storage · Wagon Timber Storage, LLC
53.5 MWIn study Knox, TXERCOT Jan 2025target 2028
Solar project AI1-151, Adams County
Solar
53.2 MWIn study Adams, OHPJM Sep 2022target 2027
Fighting Jays Battery
Battery storage
53.2 MWPaused / redesign Fort Bend, TXERCOT Aug 2021
Solar + storage project 630, Elko County
Solar + storage · Elko County Solar 1, LLC
53.0 MWPaused / redesign Elko, NVWest Jan 2022target 2025
Solar + storage project Q339, Yavapai County
Solar + storage
53.0 MWPaused / redesign Yavapai, AZWest Mar 2020target 2022
Solar project AG2-073, Madison County
Solar · SR Madison, LLC
53.0 MWIn study Madison, KYPJM Mar 2025target 2024
Mayacamas Geothermal
Geothermal
53.0 MWIn study Sonoma, CACAISO Apr 2021target 2030
Onshore wind project GEN-2020-069, Cherry County
Onshore wind
52.9 MWIn study Cherry, NESPP Apr 20202025
Mars Solar
Solar
52.8 MWPaused / redesign Childress, TXERCOT Feb 2019
Solar project AH2-080, Brunswick County
Solar
52.7 MWIn study Brunswick, VAPJM Jan 2022target 2025
Onshore wind project GEN-2026-PR1, Ochiltree County
Onshore wind
52.6 MWIn study Ochiltree, TXSPP Dec 2025target 2030
Solar + storage project AH2-076, Perry County
Solar + storage
52.5 MWIn study Perry, KYPJM Jan 2022target 2023
Battery storage project AH2-145, King George County
Battery storage
52.3 MWIn study King George, VAPJM Feb 2022target 2027
Battery storage project GEN-2024-SR13, Bryan County
Battery storage
52.2 MWIn study Bryan, OKSPP May 2024target 2026
Clermont County Solar Project
Battery storage
52.2 MWPaused / redesign Clermont, OHPJM Jun 2019target 2025
Solar project GEN-2023-135, Bowie County
Solar
52.0 MWIn study Bowie, TXSPP Oct 2023target 2026
Sunbelt Storage
Solar + storage · Rose Hill Solar LLC
52.0 MWIn study Kaufman, TXERCOT Nov 2021target 2026
Battery storage project AH2-372, Stephenson County
Battery storage
52.0 MWIn study Stephenson, ILPJM Mar 2022target 2028
Scafell Storage
Battery storage
52.0 MWIn study San Diego, CACAISO Apr 2020target 2029
Solar project 111, Polk County
Solar
52.0 MWIn study Polk, FLSoutheast Mar 2024target 2027
Gas project AG2-562, St. Joseph County
Gas · St. Joseph Energy Center, LLC
52.0 MWIn study St. Joseph, INPJM May 2025target 2022
Steppe Reserve Storage
Battery storage · KCE TX 25, LLC
51.9 MWIn study Dimmit, TXERCOT Jan 2021target 2028
Orchard Ray BESS
Battery storage · Pettus BESS
51.9 MWIn study Bee, TXERCOT Jun 2023target 2027
Fluvanna Max BESS SLF
Solar + storage · Fluvanna Max Solar LLC
51.8 MWIn study Scurry, TXERCOT Dec 2024target 2029
Findley BESS
Solar + storage · Gransolar Texas Sixteen, LLC
51.7 MWIn study Limestone, TXERCOT Feb 2024target 2028
High Chaparral BESS 138kV
Battery storage · High Chaparral Solar Project, LLC
51.7 MWPaused / redesign Brazoria, TXERCOT Jan 2021target 2023
Solar + storage project AH2-199, Will County
Solar + storage
51.7 MWIn study Will, ILPJM Mar 2022target 2026
Solar project AI1-120, Warren County
Solar
51.6 MWIn study Warren, NJPJM Sep 2022target 2025
Solar project AI2-196, Lycoming County
Solar
51.5 MWIn study Lycoming, PAPJM Mar 2023target 2025
Page 116 of 138

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)