United States › Grid › Interconnection queues › Maryland
SOLAR · PJMSolar project AG2-617, Anne Arundel County
Solar project AG2-617, Anne Arundel County is a 55.0 MW solar request in interconnection study in the PJM interconnection queue, in Anne Arundel County, Maryland, connecting to BGE.
Queue statusIn planning
- PlanningQueued Mar 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2023 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AG2-617
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- BGE
- Developer
- Dairy Farm Solar, L.L.C.
- Connection point (POI)
- Waugh Chapel 115 kV
- Location
- Anne Arundel County, Maryland
- Technology
- Solar: 55.0 MW
- Total requested
- 55.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Active
- Entered queue
- 4 March 2025
- Proposed online date
- December 2023
Location
Marker shows the centre of Anne Arundel County; the queue data does not give exact sites.
Other requests in Anne Arundel County
- Frosty Valley Energy CenterSolar · 20.0 MW · agreement signed
- Dorchester County Solar 1 ProjectSolar · 20.0 MW · built
- Millersville Landfill & Resource Recovery FacilityGas · 4.0 MW · built
- Fairhaven Battery Energy Storage SystemBattery storage · 2.5 MW · built
- Chapel Energy Storage FacilityBattery storage · 300 MW · withdrawn
- Battery storage project AG2-207, Anne Arundel CountyBattery storage · 275 MW · withdrawn
- Battery storage project AG2-319, Anne Arundel CountyBattery storage · 150 MW · withdrawn
- Battery storage project AG2-225, Anne Arundel CountyBattery storage · 115 MW · withdrawn
- Solar project AF2-435, Anne Arundel CountySolar · 55.0 MW · withdrawn
- Solar project AB2-125, Anne Arundel CountySolar · 3.3 MW · withdrawn
- Battery storage project AB1-041, Anne Arundel CountyBattery storage · 0.0 MW · withdrawn
- Battery storage project AB1-037, Anne Arundel CountyBattery storage · 0.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem