United States βΊ Grid βΊ Interconnection queues βΊ Maryland
SOLAR Β· PJMSolar project AF2-435, Anne Arundel County
Solar project AF2-435, Anne Arundel County is a 55.0 MW solar request withdrawn in the PJM interconnection queue, in Anne Arundel County, Maryland, connecting to BGE.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2020 (completed)
- Withdrawn / abandonedSep 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AF2-435
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- BGE
- Connection point (POI)
- Waugh Chapel 115 kV
- Location
- Anne Arundel County, Maryland
- Technology
- Solar: 55.0 MW
- Total requested
- 55.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 31 March 2020
- Proposed online date
- September 2023
- Withdrawn
- September 2020
Location
Marker shows the centre of Anne Arundel County; the queue data does not give exact sites.
Other requests in Anne Arundel County
- Frosty Valley Energy CenterSolar Β· 20.0 MW Β· agreement signed
- Solar project AG2-617, Anne Arundel CountySolar Β· 55.0 MW Β· in study
- Dorchester County Solar 1 ProjectSolar Β· 20.0 MW Β· built
- Millersville Landfill & Resource Recovery FacilityGas Β· 4.0 MW Β· built
- Fairhaven Battery Energy Storage SystemBattery storage Β· 2.5 MW Β· built
- Chapel Energy Storage FacilityBattery storage Β· 300 MW Β· withdrawn
- Battery storage project AG2-207, Anne Arundel CountyBattery storage Β· 275 MW Β· withdrawn
- Battery storage project AG2-319, Anne Arundel CountyBattery storage Β· 150 MW Β· withdrawn
- Battery storage project AG2-225, Anne Arundel CountyBattery storage Β· 115 MW Β· withdrawn
- Solar project AB2-125, Anne Arundel CountySolar Β· 3.3 MW Β· withdrawn
- Battery storage project AB1-041, Anne Arundel CountyBattery storage Β· 0.0 MW Β· withdrawn
- Battery storage project AB1-037, Anne Arundel CountyBattery storage Β· 0.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem