United States › Grid › Interconnection queues › Maryland
GAS · PJMMillersville Landfill & Resource Recovery Facility
Millersville Landfill & Resource Recovery Facility is a 4.0 MW gas request built and operating in the PJM interconnection queue, in Anne Arundel County, Maryland, connecting to BGE.
Request details
- Queue ID
- V3-037
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- BGE
- Connection point (POI)
- Naval Academy Junction 13kV
- Location
- Anne Arundel County, Maryland
- Technology
- Gas: 4.0 MW
- Total requested
- 4.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Operational
- Entered queue
- 14 September 2009
- Agreement signed
- 23 January 2011
- Proposed online date
- May 2013
- Came online
- June 2012
Location
Marker shows the centre of Anne Arundel County; the queue data does not give exact sites.
Other requests in Anne Arundel County
- Frosty Valley Energy CenterSolar · 20.0 MW · agreement signed
- Solar project AG2-617, Anne Arundel CountySolar · 55.0 MW · in study
- Dorchester County Solar 1 ProjectSolar · 20.0 MW · built
- Fairhaven Battery Energy Storage SystemBattery storage · 2.5 MW · built
- Chapel Energy Storage FacilityBattery storage · 300 MW · withdrawn
- Battery storage project AG2-207, Anne Arundel CountyBattery storage · 275 MW · withdrawn
- Battery storage project AG2-319, Anne Arundel CountyBattery storage · 150 MW · withdrawn
- Battery storage project AG2-225, Anne Arundel CountyBattery storage · 115 MW · withdrawn
- Solar project AF2-435, Anne Arundel CountySolar · 55.0 MW · withdrawn
- Solar project AB2-125, Anne Arundel CountySolar · 3.3 MW · withdrawn
- Battery storage project AB1-041, Anne Arundel CountyBattery storage · 0.0 MW · withdrawn
- Battery storage project AB1-037, Anne Arundel CountyBattery storage · 0.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem