BATTERY STORAGE · PJMChapel Energy Storage Facility
Chapel Energy Storage Facility is a 300 MW battery storage request withdrawn in the PJM interconnection queue, in Anne Arundel County, Maryland, connecting to BGE.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2020 (completed)
- Withdrawn / abandonedNov 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG1-104
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- BGE
- Connection point (POI)
- Waugh Chapel 230 kV
- Location
- Anne Arundel County, Maryland
- Technology
- Battery: 300 MW
- Total requested
- 300 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 25 August 2020
- Proposed online date
- June 2029
- Withdrawn
- November 2025
Location
Marker shows the centre of Anne Arundel County; the queue data does not give exact sites.
Other requests in Anne Arundel County
- Frosty Valley Energy CenterSolar · 20.0 MW · agreement signed
- Solar project AG2-617, Anne Arundel CountySolar · 55.0 MW · in study
- Dorchester County Solar 1 ProjectSolar · 20.0 MW · built
- Millersville Landfill & Resource Recovery FacilityGas · 4.0 MW · built
- Fairhaven Battery Energy Storage SystemBattery storage · 2.5 MW · built
- Battery storage project AG2-207, Anne Arundel CountyBattery storage · 275 MW · withdrawn
- Battery storage project AG2-319, Anne Arundel CountyBattery storage · 150 MW · withdrawn
- Battery storage project AG2-225, Anne Arundel CountyBattery storage · 115 MW · withdrawn
- Solar project AF2-435, Anne Arundel CountySolar · 55.0 MW · withdrawn
- Solar project AB2-125, Anne Arundel CountySolar · 3.3 MW · withdrawn
- Battery storage project AB1-041, Anne Arundel CountyBattery storage · 0.0 MW · withdrawn
- Battery storage project AB1-037, Anne Arundel CountyBattery storage · 0.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem