🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Maryland

BATTERY STORAGE · PJM

Chapel Energy Storage Facility

Chapel Energy Storage Facility is a 300 MW battery storage request withdrawn in the PJM interconnection queue, in Anne Arundel County, Maryland, connecting to BGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2020 (completed)
  2. Withdrawn / abandonedNov 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AG1-104
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
BGE
Connection point (POI)
Waugh Chapel 230 kV
Location
Anne Arundel County, Maryland
Technology
Battery: 300 MW
Total requested
300 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
Queue status
Withdrawn
Entered queue
25 August 2020
Proposed online date
June 2029
Withdrawn
November 2025

Location

Marker shows the centre of Anne Arundel County; the queue data does not give exact sites.

Power plants in Maryland · Transmission lines in Maryland

Other requests in Anne Arundel County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem