| Project | Capacity | Status |
|---|---|---|
| Solar project AH2-130 Solar |
85.0 MW | In study |
| Battery storage project AG2-339, Sussex County Battery storage · Cassius Blue Solar LLC |
85.0 MW | In study |
| Solar + storage project AI1-112, Champaign County Solar + storage |
85.0 MW | In study |
| Battery storage project 124, Pierce County Battery storage |
85.0 MW | Paused / redesign |
| Solar + storage project J4029, Mississippi County Solar + storage |
85.0 MW | In study |
| Solar project J2874, Bay County Solar |
85.0 MW | In study |
| Battery storage project AH1-673, Cook County Battery storage · Big Shoulders Storage LLC |
85.0 MW | In study |
| Solar + storage project AI1-165, Green County Solar + storage |
85.0 MW | In study |
| Windsor PVI Solar |
85.0 MW | Paused / redesign |
| Solar project AH2-164, Crawford County Solar |
85.0 MW | In study |
| RedSun BESS Solar + storage · Gransolar Texas Twenty Two |
84.0 MW | In study |
| Lupinus Storage 1 Solar + storage · Lupinus Solar, LLC |
84.0 MW | In study |
| Solar project AI2-115, Delaware County Solar |
84.0 MW | In study |
| FLIFER Solar I Solar · FLIFER LLC |
84.0 MW | In study |
| Battery storage project AH2-374, Richland County Battery storage |
84.0 MW | In study |
| Billie Storage Battery storage · Weslaco Storage LLC |
83.8 MW | In study |
| Solar project AI2-330, Madison County Solar |
83.5 MW | In study |
| Onshore wind project AH2-247, Cambria County Onshore wind |
83.3 MW | In study |
| Onshore wind project AH2-248, Cambria County Onshore wind |
83.3 MW | In study |
| Onshore wind project AH2-403, Cambria County Onshore wind |
83.3 MW | In study |
| Battery storage project AH2-422, Westmoreland County Battery storage |
83.0 MW | In study |
| Solar + storage project AI1-132, Washington County Solar + storage |
83.0 MW | In study |
| Galaxy I Solar Solar + storage · Galaxy Solar, LLC |
82.9 MW | In study |
| Solar project AI2-063, Mckean County Solar |
82.5 MW | In study |
| Harper Energy Storage Battery storage · VESI 31 LLC |
82.4 MW | In study |
| M-Bar BESS I Solar + storage · M-Bar Energy I, LLC |
82.1 MW | In study |
| Proving Ground Solar Solar + storage · Lantana Solar LLC |
82.1 MW | In study |
| Hector Solar Solar + storage · Hector Solar, LLC |
81.6 MW | In study |
| Stegall Solar Solar + storage · BT Martin Solar, LLC |
81.6 MW | In study |
| Sunbelt Solar Solar + storage · Rose Hill Solar LLC |
81.5 MW | In study |
| Soluce Bravo Solar Solar + storage · BNPB1, LLC |
80.5 MW | In study |
| Juniperusss Solar + storage · BLUE STONE RENEWABLE XXI LLC |
80.3 MW | In study |
| Beaver Creek Solar Solar |
80.3 MW | Paused / redesign |
| Battery storage project G0884, Lane County Battery storage |
80.0 MW | In study |
| Solar project J3653, Washtenaw County Solar |
80.0 MW | In study |
| Solar + storage project IC-1072, Marengo County Solar + storage |
80.0 MW | Paused / redesign |
| Solar project AH1-239, Boone County Solar · Clinton Solar, LLC |
80.0 MW | In study |
| Solar + storage project AI2-004, Brunswick County Solar + storage |
80.0 MW | In study |
| Other project G0877, Lane County Other |
80.0 MW | In study |
| Solar project G0879, Lane County Solar |
80.0 MW | In study |
| Solar project 20220316001, Aiken County Solar |
80.0 MW | In study |
| Solar + storage project IC-1054, Pike County Solar + storage |
80.0 MW | Paused / redesign |
| Solar project IC-1066, Dale County Solar |
80.0 MW | Paused / redesign |
| Solar project AG2-423, Barbour County Solar · Falling Waters Solar, LLC |
80.0 MW | In study |
| Solar + storage project 309, Yellowstone County Solar + storage |
80.0 MW | In study |
| Long Cane Solar Solar + storage |
80.0 MW | In study |
| Solar + storage project C2-180, Harney County Solar + storage |
80.0 MW | In study |
| Poseidon Storage Battery storage · Poseidon Energy, LLC |
80.0 MW | In study |
| Solar project IC-832, Monroe County Solar |
80.0 MW | Paused / redesign |
| Battery storage project J2879, Washington County Battery storage |
80.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,496 · 455.6 GW
- ERCOT (Texas)1,408 · 328.0 GW
- MISO (Midcontinent)1,337 · 302.2 GW
- Southeast (non-ISO utilities)815 · 118.5 GW
- SPP (Southwest Power Pool)480 · 114.8 GW
- PJM (Mid-Atlantic, Midwest)905 · 105.4 GW
- CAISO (California)194 · 92.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)27 · 6,015 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)