United States › Grid › Interconnection queues › Pennsylvania

BATTERY STORAGE · PJM

Poseidon Storage

Poseidon Storage is a 80.0 MW battery storage request in interconnection study in the PJM interconnection queue, in Fayette County, Pennsylvania, connecting to APS.

Queue statusIn planning
  1. PlanningQueued Feb 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2024 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
AH1-249
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
APS
Developer
Poseidon Energy, LLC
Connection point (POI)
Lardin - Lake Lynn 138kV
Location
Fayette County, Pennsylvania
Technology
Battery: 80.0 MW
Total requested
80.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Active
Entered queue
4 February 2025
Proposed online date
December 2024

Location

Marker shows the centre of Fayette County; the queue data does not give exact sites.

Power plants in Pennsylvania · Transmission lines in Pennsylvania

Other requests in Fayette County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem