NESO TEC REGISTER · GREAT BRITAIN

Wind + storage projects in the connection queue on the SSEN Transmission (north Scotland) network

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown485.9 GW in total
In planning44scoping or awaiting consent
Consented or building1closest to connecting
Built3connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

48 projects
ProjectCapacityStageConnection siteFrom
Glenfiddich West
Wind + storage · Boralex Limited
600 MWScoping New North East Substation 400kV Substation
SSEN Transmission (north Scotland)
Oct 2037
Dunan Hill
Wind + storage · Perigus Energy UK Limited
250 MWScoping Dunan Hill 400kV substation
SSEN Transmission (north Scotland)
Oct 2035
Cnoc Buidhe Wind Farm
Wind + storage · Cnoc Buidhe Wind Energy Hub Limited
220 MWScoping Cnoc Buidhe 132kV/33kV Substation
SSEN Transmission (north Scotland)
Oct 2034
Clash Gour
Wind + storage · Clash Gour Windfarm Holdings Limited
210 MWAwaiting Consents Clash Gour Wind Farm 132kV Substation
SSEN Transmission (north Scotland)
Oct 2029
Clune Wind Farm
Wind + storage · Renewable Energy Systems Limited
187 MWScoping Clune 132/33 kV Substation
SSEN Transmission (north Scotland)
Apr 2030
Creag Dhubh Windfarm
Wind + storage · Invenergy Development UK Ltd
171 MWScoping Creag Dhubh Wind Farm and BESS 132kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Limekiln Extension 2
Wind + storage · Boralex Limited
171 MWScoping New Limekiln 132 kV Substation
SSEN Transmission (north Scotland)
Oct 2037
Highland Wind Farm
Wind + storage · Highland Wind Farm Limited
168 MWScoping Highland Wind Farm 132/33kV substation
SSEN Transmission (north Scotland)
Oct 2030
Limekiln
Wind + storage · Limekiln Extension Limited
167 MWScoping Limekilns 132/33kV substation
SSEN Transmission (north Scotland)
Dec 2030
Deucheran Hill 2 Wind Farm
Wind + storage · RWE Renewables UK Onshore Wind Limited
165 MWScoping Deucheran Hill 2 132Kv Substation
SSEN Transmission (north Scotland)
Oct 2034
Glen Lednock
Wind + storage · Glen Lednock Wind Farm Limited
165 MWScoping Glen Lednock 132kV Substation
SSEN Transmission (north Scotland)
Nov 2031
Balinoe Wind Farm
Wind + storage · RWE Renewables UK Onshore Wind Limited
161 MWScoping Balinoe 132kV substation
SSEN Transmission (north Scotland)
Oct 2034
Meall Dearg
Wind + storage · Energyfarm UK Meall Dearg Ltd
150 MWScoping New North West 132kV Substation
SSEN Transmission (north Scotland)
Oct 2037
Cnoc Buidhe Wind Farm
Wind + storage · Cnoc Buidhe Wind Energy Hub Limited
150 MWScoping Cnoc Buidhe 132kV/33kV Substation
SSEN Transmission (north Scotland)
Apr 2030
Achrugan Wind Farm
Wind + storage · Statkraft Windco 1 Limited
149 MWScoping Achrugan 132kV Substation
SSEN Transmission (north Scotland)
Jul 2030
Ballach
Wind + storage · Energyfarm UK Ballach Ltd
149 MWScoping New North West 132kV Substation
SSEN Transmission (north Scotland)
Oct 2037
Aberarder Extension Wind Farm
Wind + storage · Renewable Energy Systems Limited
138 MWScoping Aberarder Extension Wind Farm 132/33kV Substation
SSEN Transmission (north Scotland)
Apr 2031
Altnabreac Windfarm
Wind + storage · Altnabreac Wind Farm Limited
130 MWScoping Connagill 275kV Substation
SSEN Transmission (north Scotland)
Oct 2032
Culachy Wind Farm
Wind + storage · Fred Olsen Renewables Limited
115 MWScoping Fort Augustus 2 400kV Substation
SSEN Transmission (north Scotland)
Oct 2037
Slickly Wind Farm
Wind + storage · Slickly Wind Farm Limited
114 MWConsents Approved Slickly Wind Farm 132kV Substation
SSEN Transmission (north Scotland)
Dec 2029
Coille Linne
Wind + storage · Energyfarm UK Coille Linne Ltd
113 MWScoping Coille Linne 132kV Substation
SSEN Transmission (north Scotland)
Oct 2037
Limekiln
Wind + storage · Limekiln Extension Limited
106 MWBuilt Limekilns 132/33kV substation
SSEN Transmission (north Scotland)
Aultmore Wind Farm (2023)
Wind + storage · Vattenfall Wind Power Ltd
105 MWScoping Aultmore Wind Farm 132/33kV Substation
SSEN Transmission (north Scotland)
Sep 2030
Eredine Wind Farm
Wind + storage · RWE Renewables UK Onshore Wind Limited
105 MWScoping An Suidhe 275/33kV
SSEN Transmission (north Scotland)
Nov 2029
Ourack Wind Farm
Wind + storage · Ourack Wind Farm LLP
105 MWScoping Ourack Wind Farm 132/33 kV Substation
SSEN Transmission (north Scotland)
Oct 2030
Sleat Hybrid
Wind + storage · Galileo 13 Limited
100 MWScoping Broadford GSP
SSEN Transmission (north Scotland)
Oct 2034
Brunt Hill Wind Farm
Wind + storage · Brunt Hill Limited
99 MWAwaiting Consents Westfield 132/33kV
SSEN Transmission (north Scotland)
Oct 2031
Quintfall Forest Hybrid Wind and BESS 1
Wind + storage · Voltalia UK Ltd
99 MWScoping Gills Bay 132kV
SSEN Transmission (north Scotland)
Oct 2037
Kyllachy Wind Farm
Wind + storage · Wind Estate (UK) Limited
91 MWScoping Tomatin 132kV Substation Extension
SSEN Transmission (north Scotland)
Oct 2037
Breackerie wind farm
Wind + storage · Energyfarm UK Breackerie Ltd
91 MWScoping Breackerie 132kV Substation
SSEN Transmission (north Scotland)
Oct 2037
Rowan Wind Energyfarm
Wind + storage · Energyfarm Rowan LLP
91 MWScoping Rowan 275/33kV Substation
SSEN Transmission (north Scotland)
Oct 2034
Edinbane Windfarm
Wind + storage · Vattenfall Wind Power Ltd
90 MWScoping Edinbane 132/33kV Substation
SSEN Transmission (north Scotland)
Apr 2033
Woodcock Hill Wind Farm
Wind + storage · Perigus Energy UK Limited
90 MWScoping Woodcock Hill WF Substation
SSEN Transmission (north Scotland)
Oct 2032
Acheilidh Wind Farm
Wind + storage · Energyfarm UK Acheilidh Ltd
84 MWScoping Acheilidh Wind farm 132kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Kirkan Wind Farm
Wind + storage · Kirkan Wind Farm Limited
82 MWScoping Corriemoillie 2 400/132kV Substation
SSEN Transmission (north Scotland)
Oct 2033
Caorach
Wind + storage · Invenergy Development UK Ltd
81 MWScoping Caorach 132 KV Substation
SSEN Transmission (north Scotland)
Oct 2033
Tarvie Wind Farm
Wind + storage · Koehler Renewable Energy UK Limited
77 MWScoping Beauly substation 275KV
SSEN Transmission (north Scotland)
Oct 2033
Windburn
Wind + storage · Windburn Wind Farm Limited
75 MWScoping Braco West GSP
SSEN Transmission (north Scotland)
Oct 2035
Strath Oykel Wind Farm
Wind + storage · Energyfarm Strath Oykel LLP
74 MWAwaiting Consents Shin 1 GSP
SSEN Transmission (north Scotland)
Oct 2032
Crakaig Wind Energy Hub
Wind + storage · Crakaig Wind Energy Hub Limited
60 MWScoping Brora 132/33Kv Grid Supply Point Substation
SSEN Transmission (north Scotland)
Oct 2034
Balnespick Wind Farm
Wind + storage · Fred Olsen Renewables Limited
58 MWScoping Balnespick Wind Farm 132kV/33kV Substation
SSEN Transmission (north Scotland)
Oct 2032
Melvich Wind Energy Hub
Wind + storage · Melvich Wind Energy Hub Limited
58 MWAwaiting Consents Melvich Community Wind Farm 132/33kV Substation
SSEN Transmission (north Scotland)
Apr 2030
Greenburn Wind & BESS
Wind + storage · Hm Gb (Wind) Ltd
50 MWScoping Coupar Angus 2 GSP
SSEN Transmission (north Scotland)
Oct 2031
Daviot Windfarm BEGA
Wind + storage · Cubico UK Development Limited
45 MWScoping Inverness 132/33Kv Grid Supply Point Substation
SSEN Transmission (north Scotland)
Oct 2030
Cairnborrow Wind Energy Hub
Wind + storage · Bpuwl 29 Limited
43 MWScoping Cairnford GSP
SSEN Transmission (north Scotland)
Oct 2031
Melvich Wind Energy Hub (BEGA)
Wind + storage · Melvich Wind Energy Hub Limited
43 MWAwaiting Consents Dounreay 2 275/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2033
Edinbane Windfarm
Wind + storage · Vattenfall Wind Power Ltd
41 MWBuilt Edinbane 132/33kV Substation
SSEN Transmission (north Scotland)
Hywind Wind Farm
Wind + storage · Hywind (Scotland) Limited
30 MWBuilt Peterhead Grange GSP
SSEN Transmission (north Scotland)

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.