Grid connection projects in the connection queue on the SP Transmission (south Scotland) network

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown31969.7 GW in total
In planning319scoping or awaiting consent
Consented or building64closest to connecting
Built84connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

319 projects · page 7 of 7
ProjectCapacityStageConnection siteFrom
Rowancraig Wind Farm
Onshore wind · Koehler Renewable Energy UK Limited
40 MWScoping Rowancraig Wind Farm 33Kv Substation
SP Transmission (south Scotland)
May 2030
Middleton Farm Solar
Solar · Bluestone Middleton Farm 1 Ltd
39 MWScoping Elderslie 132/33kV
SP Transmission (south Scotland)
Jun 2028
Craigdow Hill Wind Farm
Onshore wind · Abei Energy Limited
38 MWScoping Maybole GSP
SP Transmission (south Scotland)
Oct 2032
Craig Nab Wind Energy Hub
Wind + storage · Craig Nab Wind Energy Hub Limited
36 MWScoping Ladyburn 132kV Substation
SP Transmission (south Scotland)
Aug 2031
Hawkwood Wind Farm
Onshore wind · Wilson Renewables IV LLP
34 MWScoping Hawkwood Windfarm 33kV Substation
SP Transmission (south Scotland)
Apr 2030
Lorg Extension Wind Farm
Onshore wind · RWE Renewables UK Onshore Wind Limited
33 MWScoping Lorg Extension Wind Farm 132/33kV Substation
SP Transmission (south Scotland)
Aug 2029
Drummarnock Wind Farm
Onshore wind · Drummarnock Wind Farm Limited
30 MWScoping Bonnybridge 132/33kV
SP Transmission (south Scotland)
Oct 2026
Meiklelaught Farm BESS
Battery storage · GPC 1127 Ltd
30 MWScoping Saltcoats 132/33kV
SP Transmission (south Scotland)
Aug 2028
Ardoch Farm Battery Storage
Battery storage · Capbal (Kilwinning) Limited
27 MWScoping Kilwinning 132/33kV
SP Transmission (south Scotland)
Apr 2026
Bankhead 25MW BESS
Battery storage · GPC 1169 Ltd
25 MWScoping Devonside 132/33kV
SP Transmission (south Scotland)
Apr 2030
Elvanfoot (25MW) Energy Storage
Battery storage · Elvanfoot Energy Storage 3 Limited
25 MWScoping Elvanfoot Energy Storage 132/33Kv Collector Substation
SP Transmission (south Scotland)
Oct 2029
Windy Standard 1 Repower
Onshore wind · Fred Olsen Renewables Limited
22 MWScoping Dun Hill 132/33kV
SP Transmission (south Scotland)
Jun 2031
Brae WF
Wind + storage · Wind 2 Limited
20 MWScoping Linnmill GSP
SP Transmission (south Scotland)
Aug 2032
Lamford Hill
Solar + storage · Benbrack Wind Farm Limited
20 MWScoping Benbrack Wind Farm 132/33kV Substation
SP Transmission (south Scotland)
Aug 2029
Dealanach WLC WF
Onshore wind · Dealanach Limited
12 MWScoping Hopsrig Collector 132/33kV Substation
SP Transmission (south Scotland)
Dec 2026
Dersalloch Wind Farm Extension
Battery storage · Scottish Power Renewables (UK) Limited
11 MWScoping Dersalloch 132/33kV
SP Transmission (south Scotland)
Oct 2027
Enoch Hill 2 Wind Farm
Wind + storage · RWE Renewables UK Onshore Wind Limited
10 MWAwaiting Consents Enoch Hill 2 Wind Farm 33kV Substation
SP Transmission (south Scotland)
Apr 2027
Hunterston Hydrogen
Hydro and pumped storage · Statkraft Hydrogen UK Holding Limited
5 MWScoping Hunterston 400/132kV
SP Transmission (south Scotland)
Oct 2033
Fife Grid Services
Other · Kincardine Grid 3 Ltd
0 MWScoping Fife Grid Services Facility 275kV Substation
SP Transmission (south Scotland)
Jul 2027
Page 7 of 7

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.