BATTERY STORAGE · SPT

Elvanfoot (25MW) Energy Storage

Elvanfoot (25MW) Energy Storage is a 25 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at Elvanfoot Energy Storage 132/33Kv Collector Substation, with capacity due from October 2029. The connection agreement is held by Elvanfoot Energy Storage 3 Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2029 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-003278
Customer
Elvanfoot Energy Storage 3 Limited
Technology
Energy Storage System
Total capacity
25 MW
Change in this agreement
+25 MW
Capacity effective from
26 October 2029
Connection site
Elvanfoot Energy Storage 132/33Kv Collector Substation
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Elvanfoot Energy Storage · Grid map

Other projects at Elvanfoot Energy Storage 132/33Kv Collector Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem